0000000000113611

AUTHOR

Hanne S. Thorud

Lessons Learned from Managing the Design Process of a Large and Complex Construction Project Seen in a Lean Construction Perspective

The construction project being studied is a government investment related to a relocation of a biomedical institute delivering research-based knowledge and contingency support in the fields of animal health, fish health and food safety. The project covers a total of 63,000 m2 distributed over 10 buildings. The buildings have a very high degree of complexity due to a large proportion of special areas, great ambitions to the minimize environmental impact in addition to strict compliance to Infection Prevention and Control in order to achieve a world class product in its field. The project is procured as a design-bid-build project divided into 40 different execution contracts. The design alone…

research product

Continuous Improvement on Detailed Design Phase : A Process Perspective

The construction project being studied is a government investment related to the relocation of a biomedical institute delivering research-based knowledge and contingency support in the fields of animal health, fish health and food safety. The project covers a total of 63,000 square meters distributed over 10 buildings with a very high degree of complexity. The design alone has required 1 million hours, which relates to a client cost of about 100 million Euro. The purpose of this paper is to study the applied methodology for managing the detailed design to identify lessons learned from the project. The theory underlying the study is inspired by lean design management and design theory linked…

research product