0000000000181163
AUTHOR
A. Vnuchenko
Construction and commissioning of the S-Band high gradient RF laboratory at IFIC
An S-band High-Gradient (HG) Radio Frequency (RF) laboratory is under construction and commissioning at IFIC. The purpose of the laboratory is to perform investigations of high-gradient phenomena and to develop normal-conducting RF technology, with special focus on RF systems for hadron-therapy. The layout of the facility is derived from the scheme of the Xbox-3 test facility at CERN [1] and uses medium peak-power (7.5 MW) and high repetition rate (400 Hz) klystrons, whose RF output is combined to drive two testing slots to the required power. The design and construction of the various components of the system started in 2016 and has been completed. The installation and commissioning of the…
Beam Formation Studies on the CERN IS03b H$^-$ Source
Abstract An H- ion source is being operated at the new 160 MeV linear injector (Linac4) of the CERN accelerator complex. The source’s plasma is of the Radio Frequency Inductively Coupled Plasma type (RF-ICP), without magnetic cusp and runs with Cs-loss compensation [1]. Vertical downward oriented filter- and electron dump-dipolar magnetic fields expand over the plasma chamber, beam-formation, beam-extraction and electron dump regions and generate horizontal asymmetry and beam angular deflection partially compensated by mechanical alignment of the front-end. The H- beam is generated via volume and caesiated plasma surface modes, the latter inducing a radial asymmetry characterized by an incr…