Search for excited leptons in Z0 decay
Due to the severity of system-wide power outages, though their probability of occurrence is slight, regulatory authorities require that a system restoration plan be drawn up and kept up to date at all times. The power outage that affected northeastern North America in 2003 proved the need for such a requirement. The particular structure of Hydro-Quebec's power system requires the use of a highly specific system restoration procedure. The daily preparation of the system restoration plan is based on a strategy whose application requires that a restoration sequence be drawn up that uses available equipment, the electrical behavior of which has been validated using appropriate studies. Over the…