0000000000601817

AUTHOR

Marça Boronat

showing 2 related works from this author

en-usConstruction and Commissioning of the S-Band High-Gradient RF Laboratory at IFIC

2018

An S-Band High-Gradient (HG) Radio Frequency (RF) laboratory is under construction and commissioning at IFIC. The purpose of the laboratory is to perform investigations of high-gradient phenomena and to develop normal-conducting RF technology, with special focus on RF systems for hadron-therapy. The layout of the facility is derived from the scheme of the Xbox-3 test facility at CERN* and uses medium peak-power (7.5 MW) and high repetition rate (400 Hz) klystrons, whose RF output is combined to drive two testing slots to the required power. The design and construction of the various components of the system started in 2016 and has been completed. The installation and commissioning of the la…

07 Accelerator TechnologyT31 Subsystems Technology and Components OtherAccelerator Physics
researchProduct

Forward tracking at the next e+ e- collider part II: Experimental challenges and detector design

2013

Published under the terms of the Creative Commons Attribution 3.0 License.

Particle physicsHighly Granular Calorimetry [9.5]Tracking (particle physics)01 natural sciences7. Clean energylaw.inventionlawParticle tracking detectors0103 physical sciencesDetectors and Experimental Techniques010306 general physicsColliderInstrumentationMathematical PhysicsAdvanced infrastructures for detector R&D [9]PhysicsRange (particle radiation)Series (mathematics)010308 nuclear & particles physicsbusiness.industryLarge detector systems for particle and astroparticle physicsDetectorTracking systemCharged particleParticle tracking detectors (Solid-state detectors)High Energy Physics::ExperimentbusinessEnergy (signal processing)
researchProduct