Integrated Computer-Aided Innovation: The PROSIT approach
Abstract The paper presents a methodology aimed at the improvement of the product development cycle through the integration of Computer-Aided Innovation (CAI) with Optimization and PLM systems. The interoperability of these tools is obtained through the adoption of Optimization systems as a bridging element between CAI and PLM systems. This methodology was developed within the PROSIT project ( http://www.kaemart.it/prosit ). The paper describes the main issues related to the integration of these complementary instruments and the solutions proposed by the authors. More specifically, the main idea of the PROSIT project to link CAI and Optimization systems is the adoption of the latter tools n…
Oltre Bovisa. Paesaggi in movimento
Sintesi della Relazione di progetto: In coerenza con gli orientamenti del bando, tesi a definire “...un processo di intervento in grado di supportare, nel lungo periodo, tutte le operazioni necessarie al successo della trasformazione”, Il progetto assume come elementi centrali per l’impostazione dell’impianto: a. Le preesistenze storico-architettoniche-ambientali presenti nell’area; b. La presenza di spazi aperti significativi all’interno e nell’immediato intorno; c. La consistenza degli apparati infrastrutturali a differenti scale di intervento. OBIETTIVI: • 1.Ritornare al luogo : Persistenze e variazioni • 2. Definire il nuovo landscape unitario: Locale e globale • 3.Conferire qualità for…