0000000000960058

AUTHOR

D.j. Simon

showing 1 related works from this author

The new CERN-ISOLDE on-line mass-separator facility at the PS-Booster

1992

The ISOLDE on-line isotope separators have been operated since 1967 at the CERN-SC. This 600 MeV proton synchro-cyclotron had to be shut down in December 1990 after 33 years of service and it was decided to move ISOLDE to a new experimental area. The new on-line mass-separator facility is now under construction at the CERN PS-Booster. This accelerator provides an average current of about 2-mu-A of 1 GeV protons in very short high intensity pulses at low repetition rate. The beam can hit either one of the two target stations, the general purpose separator (GPS), a reconstructed ISOLDE-2 type machine (which can deliver beams simultaneously into three beam lines), and the high resolution separ…

PhysicsNuclear and High Energy PhysicsLarge Hadron ColliderProtonSeparator (oil production)ISOLTRAPIsotope separationlaw.inventionNuclear physicsBeamlineGeneral purposelawDetectors and Experimental TechniquesInstrumentationBeam (structure)Nuclear Instruments and Methods in Physics Research Section B: Beam Interactions with Materials and Atoms
researchProduct