Search results for " Scheduling"

showing 10 items of 158 documents

Robustness in railway transportation scheduling

2008

Railway scheduling has been a significant issue in the railway industry. Over the last few years, numerous approaches and tools have been developed to compute railway scheduling. However, robust solutions are necessary to absorb short disruptions. In this paper, we present the robustness problem from the point of view of railway operators and we give some guidelines to measure robustness in timetabling. We have developed some formulae to compare robustness between two timetables based on the study of railway infrastructure topology and buffer times. Thus, each buffer time is pondered by some factors such as tightest tracks, number of subsequent trains, remaining stations, etc. This method i…

Transport engineeringEngineeringJob shop schedulingOperations researchRobustness (computer science)business.industryInformationSystems_INFORMATIONSYSTEMSAPPLICATIONSRail transportationRailway transportationComputerApplications_COMPUTERSINOTHERSYSTEMSTrainbusinessScheduling (computing)2008 7th World Congress on Intelligent Control and Automation
researchProduct

A multi-objective genetic algorithm for the passenger maritime transportation problem

2014

Over the last years, the transportation demand has continuously increased and a further growth is predicted for the next future especially as regards the maritime sector. As a consequence, shipping companies will be asked to improve the supplied services in order to assure a high quality and time-effective goods and passengers transportation, deriving at the same time their own benefits by minimizing costs. Therefore, the optimization of routes and schedules together with the fleet deployment take a meaningful role on companies profitability and efficiency. In such a perspective, the present paper proposes a multi-objective mathematical programming model to determine a set of routes and sch…

Transportation Routing Scheduling Fleet Sizing Genetic Algorithms
researchProduct

Bidirectional labeling for solving vehicle routing and truck driver scheduling problems

2020

Abstract This paper studies the vehicle routing and truck driver scheduling problem where routes and schedules must comply with hours of service regulations for truck drivers. It presents a backward labeling method for generating feasible schedules and shows how the labels generated with the backward method can be combined with labels generated by a forward labeling method. The bidirectional labeling is embedded into a branch-and-price-and-cut approach and evaluated for hours of service regulations in the United States and the European Union. Computational experiments show that the resulting bidirectional branch-and-price-and-cut approach is significantly faster than unidirectional counterp…

Truck050210 logistics & transportation021103 operations researchInformation Systems and ManagementGeneral Computer ScienceJob shop schedulingComputer sciencebusiness.industry05 social sciences0211 other engineering and technologies02 engineering and technologyManagement Science and Operations ResearchTruck driverIndustrial and Manufacturing EngineeringScheduling (computing)Modeling and Simulation0502 economics and businessVehicle routing problemmedia_common.cataloged_instanceEuropean unionRouting (electronic design automation)businessHours of servicemedia_commonComputer networkEuropean Journal of Operational Research
researchProduct

Simultaneous Vehicle and Crew Routing and Scheduling for Partial- and Full-Load Long-Distance Road Transport

2013

AbstractThis paper studies a simultaneous vehicle and crew routing and scheduling problem arising in long-distance road transport in Europe: Pickup-and-delivery requests have to be fulfilled over a multi-period planning horizon by a heterogeneous fleet of trucks and drivers. Typically, in the vehicle routing literature, a fixed assignment of a driver to a truck is assumed. In our approach, we abandon this assumption and allow truck/driver changes at geographically dispersed relay stations. This offers greater planning flexibility and allows a better utilization of trucks, but also creates intricate interdependencies between trucks and drivers and requires the synchronization of their routes…

TruckJob shop schedulingOperations researchfull truckload transportationComputer scienceForwarderCrewTime horizonlcsh:BusinessVehicle routing problemddc:650Business Management and Accounting (miscellaneous)media_common.cataloged_instanceRouting (electronic design automation)European unionlcsh:HF5001-6182crew schedulingsynchronizationvehicle routingmedia_commonBusiness Research
researchProduct

Trade-Off between Increased Talk-Time and LTE Performance

2010

The purpose of this paper is to analyze the trade-off conditions between battery saving opportunities and long term evolution network performance. To achieve this goal voice over IP with discontinuous reception is studied. Analysis is conducted with vast amount of different settings, including on duration, inactivity and discontinuous reception cycle timers. The quality of service and battery saving opportunities with discontinuous reception are evaluated with a dynamic system simulator which enables detailed simulation of multiple users and cells with realistic assumptions. This paper indicates high battery saving, i.e., increased talk-time opportunities without compromising the performanc…

Voice over IPComputer sciencebusiness.industryQuality of serviceDiscontinuous receptionNetwork performanceDynamic priority schedulingbusinessComputer networkTerm (time)2010 Ninth International Conference on Networks
researchProduct

Simulation-Based Performance Study of e-Commerce Web Server System – Results for FIFO Scheduling

2013

The chapter concerns the issue of overloaded Web server performance evaluation using a simulation-based approach. We focus on a Business-to-Consumer (B2C) environment and consider server performance both from the perspective of computer system efficiency and e-business profitability. Results of simulation experiments for the Web server system under First-In-First-Out (FIFO) scheduling are discussed. Much attention has been paid to the analysis of the impact of a limited server system capacity on business-related performance metrics.

Web serverComputer sciencebusiness.industryE-commercecomputer.software_genreFair-share schedulingScheduling (computing)Operating systemProfitability indexbusinessServer systemWeb server performancecomputerSimulation based
researchProduct

Scheduling independent stochastic tasks on heterogeneous cloud platforms

2019

International audience; This work introduces scheduling strategies to maximize the expected number of independent tasks that can be executed on a cloud platform within a given budget and under a deadline constraint. The cloud platform is composed of several types of virtual machines (VMs), where each type has a unitexecution cost that depends upon its characteristics. The amount of budget spent during the execution of a task on a given VM is the product of its execution length by the unit execution cost of that VM. The execution lengths of tasks follow a variety of standard probability distributions (exponential, uniform, halfnormal, etc.), which is known beforehand and whose mean and stand…

[INFO.INFO-CC]Computer Science [cs]/Computational Complexity [cs.CC]020203 distributed computingComputer scienceStochastic processbusiness.industryDistributed computing[INFO.INFO-DS]Computer Science [cs]/Data Structures and Algorithms [cs.DS]Processor schedulingCloud computing02 engineering and technologycomputer.software_genreScheduling (computing)Virtual machine0202 electrical engineering electronic engineering information engineeringTask analysisProbability distribution020201 artificial intelligence & image processing[INFO]Computer Science [cs][INFO.INFO-DC]Computer Science [cs]/Distributed Parallel and Cluster Computing [cs.DC]InterruptHeuristicsbusinesscomputer
researchProduct

Joint routing and per-flow fairness in wireless multihop networks

2008

In wireless multihop networks communication between two end-nodes is carried out by hopping over multiple short wireless links. Traditional CSMA/CA based media access control does not work satisfactory in a multihop scenario, since an intended target of a communication may be subject to mutual interference imposed by concurrent transmissions from nodes which cannot directly sense each other, causing unfair throughput allocation. Although TDMA seems to be a more promising solution, careful transmission scheduling is needed in order to achieve error-free communication and fairness. In our previous work, a TDMA scheduling algorithm has been proposed that schedules the transmissions in a fair m…

business.industryComputer scienceDistributed computingComputerSystemsOrganization_COMPUTER-COMMUNICATIONNETWORKSTime division multiple accessData_CODINGANDINFORMATIONTHEORYLoad balancing (computing)Network topologyScheduling (computing)WLANroutingMedia access controlWirelessMaximum throughput schedulingbusinessWireless sensor networkComputer network
researchProduct

Priority Enabled Grant-Free Access With Dynamic Slot Allocation for Heterogeneous mMTC Traffic in 5G NR Networks

2021

Although grant-based mechanisms have been a predominant approach for wireless access for years, the additional latency required for initial handshake message exchange and the extra control overhead for packet transmissions have stimulated the emergence of grant-free (GF) transmission. GF access provides a promising mechanism for carrying low and moderate traffic with small data and fits especially well for massive machine type communications (mMTC) applications. Despite a surge of interest in GF access, how to handle heterogeneous mMTC traffic based on GF mechanisms has not been investigated in depth. In this paper, we propose a priority enabled GF access scheme which performs dynamic slot …

business.industryComputer scienceNetwork packet05 social sciencesMarkov process050801 communication & media studies020206 networking & telecommunications02 engineering and technologyDynamic priority schedulingsymbols.namesake0508 media and communicationsSubframeTransmission (telecommunications)0202 electrical engineering electronic engineering information engineeringsymbolsOverhead (computing)WirelessElectrical and Electronic EngineeringbusinessVDP::Teknologi: 500::Informasjons- og kommunikasjonsteknologi: 5505GComputer networkIEEE Transactions on Communications
researchProduct

An effective approach for the maintenance scheduling in large systems with required reliability level: A case study

2015

This paper deals with the problem of the maintenance scheduling in a multi-component system for which a required reliability level has to be warranted until the next planned stop for maintenance. Particularly, the tackled problem concerns both the determination of the elements set on which to perform preventive maintenance and the optimal number of maintenance crews in order to warranty the required reliability level at the minimum maintenance cost. The problem is formulated as a mathematical programming model that becomes very hard to solve for large practical systems. For such reason, a new effective approach based on a constrained genetic algorithm is herein proposed and tested with refe…

constrained genetic algorithmSettore ING-IND/17 - Impianti Industriali Meccanicimathematical programming modelMaintenance scheduling optimizationSettore ING-IND/16 - Tecnologie E Sistemi Di Lavorazioneseries–parallel system
researchProduct