Search results for " ground"

showing 10 items of 229 documents

Ground-Fault Current Transfer at the Transition Station of a Combined Overhead-Cable Line. A Parametric Analysis

2007

When a substation is fed by a combined overhead-cable transmission line, a significant part of the ground fault current flows through the grounded cable sheaths and discharges into the earth at the transition station, where cables are connected to the overhead line. If the transition station is a dead-end steel pole structure, the local ground electrode, small and of high resistance, could be inadequate to maintain the ground potential rise within safety limits in case of a fault to ground at the receiving end substation. Based on a circuit model approach, the paper presents a parametric analysis of the fault current distribution between the faulted substation and the transition station, ta…

EngineeringParametric analysisbusiness.industryElectrical engineeringFault (power engineering)Line (electrical engineering)law.inventionSettore ING-IND/33 - Sistemi Elettrici Per L'EnergiaTransmission linelawTransfer (computing)Overhead cableSubstations Fault currents Circuit faults Power overhead lines Power cables Cable shielding Satellite ground stations Steel Electrodes SafetyCurrent (fluid)businessComputer Science::Operating SystemsOverhead line
researchProduct

Incremental dynamic based fragility assessment of reinforced concrete structures: Stationary vs. non-stationary artificial ground motions

2017

Abstract Artificial and natural records are commonly employed by researches and practitioners to perform refined seismic assessments of structures. The techniques for the generation of artificial records and their effectiveness in producing signals which are significantly representative of real earthquakes are still debated as well as results of the consequent seismic assessment to expect from their application. The paper presents an in-depth comparative study highlighting the effect of employing different typologies of artificial ground motion records on seismic assessment results, especially addressing seismic fragility curves. Three sets of 50 stationary, nonstationary evenly modulated a…

EngineeringPeak ground accelerationIncremental dynamic analysi0211 other engineering and technologiesSoil Science020101 civil engineering02 engineering and technologyIncremental dynamic analysisSpectral accelerationIncremental Dynamic Analysis0201 civil engineeringFragilitySeismic assessmentReinforced concrete structuresNonlinear dynamic analysiNon-stationary random processeNonlinear dynamic analysisCivil and Structural EngineeringReinforced concrete structureFragility curves021110 strategic defence & security studiesbusiness.industryArtificial accelerogramsNon-stationary random processesStructural engineeringArtificial accelerograms; Fragility curves; Incremental dynamic analysis; Non-stationary random processes; Nonlinear dynamic analysis; Reinforced concrete structures; Civil and Structural Engineering; Geotechnical Engineering and Engineering Geology; Soil ScienceGeotechnical Engineering and Engineering GeologyReinforced concreteArtificial accelerograms Non-stationary random processes Nonlinear dynamic analysis Incremental dynamic analysis Fragility curves Reinforced concrete structuresNonlinear systemTime historyArtificial accelerogramFragility curvebusiness
researchProduct

Effects of double ground faults in Wind Farms collector cables

2015

Medium Voltage collector cables of Wind Farms have metal shields connected to the grounding systems of the towers and of the connection station. Thanks to this bonding, when a ground fault occurs, the fault current splits itself among all the grounding systems of the wind farm, this causing a reduction of the ground potential rise at the fault location. Nevertheless, in presence of double ground faults, very high ground potential rises occur at the two fault locations and safety against electric shock is not always assured. In order to study this issue, the paper presents a model for simulating in a simple way the effects of double ground faults occurring in Medium Voltage collectors of ext…

Engineeringbusiness.industryElectric shockGroundwind plantElectrical engineeringShieldsEnergy Engineering and Power TechnologyHigh voltageHardware_PERFORMANCEANDRELIABILITYgrounding systemmedicine.diseaseFault (power engineering)MV cableSettore ING-IND/33 - Sistemi Elettrici Per L'EnergiamedicineDouble ground faultElectrical and Electronic EngineeringbusinessMarine engineeringVoltage
researchProduct

A practical method to test the safety of HV/MV substation Grounding Systems

2015

The adequacy of a Grounding System (GS) to the safety conditions has to be periodically tested by measurements. The test methods and techniques used to verify the electrical characteristics of the GS include the measurements of step and touch voltages. The goal of the test is to verify that touch voltage and step voltage remain below a safe value in all the zones of the installation. The measurements can present some operational difficulties. The purpose of this paper is to present the procedure, step-by-step, of a practical method of measuring touch/step voltages in grounding systems located in urban or industrial areas with reduced accessibility. The suggested method uses auxiliary curren…

Engineeringbusiness.industryGroundEnergy Engineering and Power Technologyglobal grounding systemground potentialgrounding systemEarthing systemelectrical safety; global grounding system; ground potential; grounding system; electrical and electronic engineering; energy engineering and power technologyElectrical safety; grounding system; Global Grounding System; Ground potentialTest (assessment)Settore ING-IND/33 - Sistemi Elettrici Per L'EnergiaSettore ING-IND/31 - ElettrotecnicaElectronic engineeringElectrical and Electronic EngineeringbusinessSimulationVoltageElectrical safety
researchProduct

Finite-Difference Time-Domain Simulation of Towers Cascade Under Lightning Surge Conditions

2015

In this paper, the simulation of towers cascade under lightning surge conditions is presented. Finite-difference time-domain method is used to solve both the Maxwell's and telegraph equations. Maxwell's equations and the time-domain resistivity model of Darveniza are used to simulate the nonlinear behavior of the grounding system. Telegraph equations are used to describe the propagation in the overhead lines. Multiple ionizations, on different grounding electrodes belonging to various towers, can be implemented simultaneously, without making assumptions on the shape of the ionized areas.

Engineeringbusiness.industryGroundFinite difference methodElectrical engineeringFinite-difference time-domain methodMechanicsSettore ING-IND/32 - Convertitori Macchine E Azionamenti ElettriciEarthing systemIndustrial and Manufacturing EngineeringFinite-difference time domain (FDTD) grounding ionization lightning Maxwell’s equationsNonlinear systemSettore ING-IND/31 - ElettrotecnicaControl and Systems EngineeringCascadeLightning surgesOverhead (computing)Electrical and Electronic Engineeringbusiness
researchProduct

The Global Grounding System: Definitions and guidelines

2015

The present paper presents the preliminary results of the ongoing Italian METERGLOB project on the contribution given by the exposed conductive parts to a Global Grounding System. One of the expected results of METERGLOB is to carry out guidelines for the identification of a Global Grounding System. These guidelines must be defined on the basis of the definitions and methods present in the current international standards on grounding and safety. In the paper some definitions and elements to be taken into account for the identification of a Global Grounding System are given.

Engineeringbusiness.industryGroundMechanical engineeringEnergy Engineering and Power TechnologyDefinitionsDefinitionGuidelinesGuidelineEarthing systemGlobal Grounding System; Ground Fault; Guidelines; DefinitionsGlobal Grounding SystemSettore ING-IND/33 - Sistemi Elettrici Per L'EnergiaIdentification (information)Definitions; Global Grounding System; Ground Fault; Guidelines; Electrical and Electronic Engineering; Energy Engineering and Power TechnologySettore ING-IND/31 - ElettrotecnicaRisk analysis (engineering)Ground FaultElectrical and Electronic Engineeringbusiness
researchProduct

Current and Voltage Behaviour During a Fault in a HV/MV System: Methods and Measurements

2015

When a single line to ground fault happens on the MV side of a HV/MV system, only a small portion of the fault current is injected into the ground by the ground-grid of the faulty substation. In fact the fault current is distributed between grounding electrodes and MV cables sheaths. In systems with isolated neutral or with resonant earthing this may be sufficient to provide safety from electric shock. Experimental measurements were performed on a real MV distribution network: a real single line to ground fault was made and fault currents were measured in the faulty substation and in four neighbouring substations. In this paper the problem of fault current distribution is introduced, the te…

Engineeringelectrical and electronic engineeringGlobal earthing systemCurrent distribution; Electrical safety; Global earthing systems; grounding; Power distribution faults; Single line to ground faultHardware_PERFORMANCEANDRELIABILITYFault (power engineering)Fault current limiterElectronic engineeringmedicineGlobal earthing systemscurrent distribution; electrical safety; global earthing systems; grounding; power distribution faults; single line to ground fault; electrical and electronic engineering; energy engineering and power technologyenergy engineering and power technologyCurrent distributionPower distribution faultsElectrical safetySingle line to ground faultElectric shockGroundbusiness.industryElectrical engineeringgroundingSingle linemedicine.diseaseEarthing systemSettore ING-IND/33 - Sistemi Elettrici Per L'EnergiaSettore ING-IND/31 - ElettrotecnicaCurrent (fluid)businessPower distribution faultVoltage
researchProduct

Influence of LV neutral grounding on global earthing systems

2015

International Standards define a Global Earthing System as an earthing net created interconnecting local Earthing Systems (generally through the shield of MV cables and/or bare buried conductors). In Italy, the regulatory authority for electricity and gas requires distributors to guarantee the electrical continuity of LV neutral conductor. This requirement has led to the standard practice of realizing “reinforcement groundings” along the LV neutral conductor path and at users’ delivery cabinet. Moreover, in urban high-load scenarios (prime candidates to be part of a Global Earthing System), it is common that LV distribution scheme creates, through neutral conductors, an effective connection…

Engineeringelectrical and electronic engineeringmaxwell subareas method020209 energyEnergy Engineering and Power TechnologyGround and neutralindustrial and manufacturing engineering02 engineering and technologyRegulatory authorityGlobal earthing system (GES) global grounding system (GGS) ground potential LV neutral conductor maxwell subareas method.control and systems engineeringlv neutral conductorShield0202 electrical engineering electronic engineering information engineeringglobal earthing systemmaxwell sub-areas methodGlobal earthing system (GES)Electrical conductorglobal grounding system (GGS)Groundbusiness.industryGES; GGS; global earthing system; global grounding system; ground potential; lv neutral conductor; maxwell sub-areas method; control and systems engineering; industrial and manufacturing engineering; electrical and electronic engineeringElectrical engineeringGlobal Earting SystemGESglobal grounding systemground potentialEarthing systemGGSGlobal earthing system (GES); global grounding system (GGS); ground potential; LV neutral conductor; maxwell subareas method; Control and Systems Engineering; Industrial and Manufacturing Engineering; Electrical and Electronic EngineeringSettore ING-IND/33 - Sistemi Elettrici Per L'EnergiaSettore ING-IND/31 - ElettrotecnicaGlobal Earting System; GES; Global Grounding System; GGS; Ground potential; Maxwell Sub-areas Method; LV neutral conductorHigh loadElectricityGES; GGS; Global earting system; global grounding system; ground potential; lv neutral conductor; maxwell sub-areas method; electrical and electronic engineering; energy engineering and power technologybusiness
researchProduct

Recommendations for ecotoxicity testing with stygobiotic species in the framework of groundwater environmental risk assessment.

2019

As a consequence of the growing global dependence on groundwater resources, environmental risk assessments (ERA) for groundwater are increasingly required and, with that, ecotoxicological studies with groundwater fauna (stygofauna). However, the literature on the ecotoxicological studies with stygobiotic species (i.e. species that complete their life cycle exclusively in groundwater) has not expanded significantly since the first paper published in this field. The limitations regarding the use of stygobiotic species for ecotoxicological testing are clear and consistent across the globe; stygobiotic species are often 1) naturally present in low numbers, 2) difficult to collect, and 3) diffic…

Environmental Engineering010504 meteorology & atmospheric sciencesStygofaunaStygofaunaChemicalTest validity010501 environmental sciencesEcotoxicology01 natural sciencesRisk AssessmentEnvironmental monitoringEnvironmental ChemistryAnimalsWater PollutantsWaste Management and DisposalGroundwater0105 earth and related environmental sciencesTest designGood laboratory practicesPollutionERADecision-makers; Ecotoxicology; ERA; Good laboratory practices; Stygofauna; Animals; Ecotoxicology; Environmental Monitoring; Groundwater; Risk Assessment; Water Pollutants ChemicalEnvironmental scienceEcotoxicityDecision-makersRisk assessmentGood laboratory practiceWater resource managementGroundwaterWater Pollutants ChemicalEnvironmental MonitoringThe Science of the total environment
researchProduct

Biological groundwater denitrification systems: Lab-scale trials aimed at nitrous oxide production and emission assessment

2018

Bio-trenches are a sustainable option for treating nitrate contamination in groundwater. However, a possible side effect of this technology is the production of nitrous oxide, a greenhouse gas that can be found both dissolved in the liquid effluent as well as emitted as off gas. The aim of this study was to analyze NO3 − removal and N2O production in lab-scale column trials. The column contained olive nut as organic carbon media. The experimental study was divided into three phases (I, II and III) each characterized by different inlet NO3 − concentrations (30, 50, 75 mg NO3-N L−1 respectively). Sampling ports deployed along the length of the column allowed to observe the denitrification pro…

Environmental EngineeringDenitrificationSettore AGR/13 - Chimica Agrariachemistry.chemical_element010501 environmental sciencesNitrogen cycle01 natural scienceschemistry.chemical_compoundPermeable reactive barriersBiological groundwater denitrificationEnvironmental ChemistryNitriteWaste Management and DisposalEffluentNitrogen cycle0105 earth and related environmental sciencesNitrous oxideSettore ICAR/03 - Ingegneria Sanitaria-AmbientaleBiotrench04 agricultural and veterinary sciencesNitrous oxidePollutionchemistryGreenhouse gasEnvironmental chemistry040103 agronomy & agriculture0401 agriculture forestry and fisheriesEnvironmental scienceCarbonGroundwater
researchProduct