Simulazione del Circuito Primario di un Impianto Nucleare LWR Mediante L'uso Integrato Dei Codici PARCS e TRACE

2012

TRACELWRSettore ING-IND/19 - Impianti Nucleari
researchProduct

TRACE input model for SPES3 facility

2010

TRACESettore ING-IND/19 - Impianti Nucleari
researchProduct

ANALYSES OF TRACE-PARCS COUPLING CAPABILITY

2011

TRACE-PARCSTRACE PARCS Coupled Codes Main Steam Line BreakSNAPSettore ING-IND/19 - Impianti Nucleari
researchProduct

Analysis of the thermo-mechanical behaviour of IFMIF Target Assembly

2013

Target Assembly Thermo-mechanicsIFMIFNUCLEAR FUSION IFMIFSettore ING-IND/19 - Impianti Nucleari
researchProduct

Divertor of the European DEMO: Engineering and technologies for power exhaust

2022

International audience; In a power plant scale fusion reactor, a huge amount of thermal power produced by the fusion reaction and external heating must be exhausted through the narrow area of the divertor targets. The targets must withstand the intense bombardment of the diverted particles where high heat fluxes are generated and erosion takes place on the surface. A considerable amount of volumetric nuclear heating power must also be exhausted. To cope with such an unprecedented power exhaust challenge, a highly efficient cooling capacity is required. Furthermore, the divertor must fulfill other critical functions such as nuclear shielding and channeling (and compression) of exhaust gas fo…

Technology020209 energyMechanical EngineeringPower exhaust02 engineering and technologyDEMO; Fusion reactor; Divertor; Plasma-facing component; High-heat-flux; Power exhaust01 natural sciences7. Clean energy010305 fluids & plasmas[SPI]Engineering Sciences [physics]Fusion reactorDivertorDEMO; Divertor; Fusion reactor; High-heat-flux; Plasma-facing component; Power exhaustNuclear Energy and Engineering0103 physical sciences0202 electrical engineering electronic engineering information engineeringPlasma-facing componentGeneral Materials ScienceHigh-heat-fluxddc:600DEMOSettore ING-IND/19 - Impianti NucleariCivil and Structural EngineeringFusion Engineering and Design
researchProduct

Maturation of critical technologies for the DEMO balance of plant systems

2022

The Pre-Concept Design (PCD) of the Balance of Plant (BoP) systems of the EU-DEMO power plant is described in this paper for both breeding blanket (BB) concepts under assessment, namely the Water Cooled Lithium Lead (WCLL) BB and the Helium Cooled Pebble Bed (HCPB) BB. Moreover, the results of a preliminary evaluation of a number of BoP variants are discussed. This paper outlines the steps of the BoP design development, highlighting the project objectives and the strategy for their achievement under the very challenging requirements which include, among others, the intermittent nature of the DEMO plasma heat source. The main achievements during the PCD Phase will be reported together with t…

TechnologyBalance of plantElectric power distributionMechanical EngineeringHCPB BBSteam generatorPower conversion systemPower plants -- Design and constructionNuclear Energy and EngineeringSteam-boilersGeneral Materials SciencePower-plants -- Europebalance of plant; DEMO; HCPB BB; power conversion system; steam generator; WCLL BBddc:600DEMOWCLL BBSettore ING-IND/19 - Impianti NucleariDEMO; Balance of plant; WCLL BB; HCPB BB; Steam generator; Power conversion systemCivil and Structural Engineering
researchProduct

Preliminary thermal-hydraulic analysis of the EU-DEMO Helium-Cooled Pebble Bed fusion reactor by using the RELAP5-3D system code

2021

Abstract In the frame of the activities promoted and encouraged by the EUROfusion Consortium aimed at developing the EU-DEMO fusion reactor, great emphasis has been placed at a very early stage of the design to incorporate the provisions needed to improve the overall plant safety and reliability performances as well as to analyse possible mitigation actions. In this framework, the research activity has been focused on the representative and safety relevant cooling loop of the Helium Cooled Pebble Bed (HCPB) Breeding Blanket (BB) Primary Heat Transfer System (PHTS), purposely selected by the safety team, in order to assess its thermal-hydraulic behaviour during normal operational conditions …

TechnologyComputer science020209 energyNuclear engineeringHCPBchemistry.chemical_element02 engineering and technologyBlanket7. Clean energy01 natural sciences010305 fluids & plasmasThermal hydraulicsReliability (semiconductor)0103 physical sciences0202 electrical engineering electronic engineering information engineeringGeneral Materials ScienceRELAP5-3DSafety and EnvironmentHeliumSettore ING-IND/19 - Impianti NucleariCivil and Structural EngineeringSteady stateFinite volume methodMechanical EngineeringFusion powerEU-DEMONuclear Energy and EngineeringchemistryThermal-hydraulicsHeat transferddc:600
researchProduct

Hydraulic Characterization of the Full Scale Mock-Up of the DEMO Divertor Outer Vertical Target

2021

In the frame of the pre-conceptual design activities of the DEMO work package DIV-1 “Divertor Cassette Design and Integration” of the EUROfusion program, a mock-up of the divertor outer vertical target (OVT) was built, mainly in order to: (i) demonstrate the technical feasibility of manufacturing procedures; (ii) verify the hydraulic design and its capability to ensure a uniform and proper cooling for the plasma facing units (PFUs) with an acceptable pressure drop; and (iii) experimentally validate the computational fluid-dynamic (CFD) model developed by the University of Palermo. In this context, a research campaign was jointly carried out by the University of Palermo and ENEA to experimen…

TechnologyControl and OptimizationRenewable Energy Sustainability and the EnvironmentTEnergy Engineering and Power Technologyplasma facing components01 natural sciences010305 fluids & plasmas0103 physical sciencesDEMO Divertor Plasma facing components Thermal hydraulicsdivertorDEMO; divertor; plasma facing components; thermal hydraulicsElectrical and Electronic Engineeringthermal hydraulics010306 general physicsEngineering (miscellaneous)DEMOSettore ING-IND/19 - Impianti NucleariEnergy (miscellaneous)
researchProduct

Identification of blanket design points using an integrated multi-physics approach

2017

Abstract The breeding blanket (BB) is one of the key components for a fusion reactor. It is expected to sustain and remove considerable heat loads due to the heat flux coming from the plasma and the nuclear power deposited by the fusion neutrons. In the design of the BB, the engineering requirements of nuclear, material and safety kind are involved. In the European DEMO project, several efforts are dedicated to the development of an integrated simulation-design tool able to perform a multi-physics analysis, allowing the characterisation of BB design points which are consistent from the neutronic, thermal-hydraulic and thermo-mechanical point of view. Furthermore, at Karlsruhe Institute of T…

TechnologyNuclear engineeringDEMO reactorBlanket7. Clean energy01 natural sciences010305 fluids & plasmasCoupling0103 physical sciencesMulti-physics approachGeneral Materials SciencePoint (geometry)Design point010306 general physicsSettore ING-IND/19 - Impianti NucleariCivil and Structural EngineeringCouplingRequirements engineeringbusiness.industryMechanical EngineeringNuclear powerFusion powerFinite element methodNuclear Energy and EngineeringHeat fluxBreeding blanketbusinessddc:600Fusion Engineering and Design
researchProduct

Integrated design of breeding blanket and ancillary systems related to the use of helium or water as a coolant and impact on the overall plant design

2021

Currently, for the EU DEMO, two Breeding Blankets (BBs) have been selected as potential candidates for the integration in the reactor. They are the Water Cooled Lithium Lead and the Helium Cooled Pebble Bed BB concepts. The two BB variants together with the associated ancillary systems drive the design of the overall plant. Therefore, a holistic investigation of integration issues derived by the BB and the installation of its ancillary systems has been performed. The issues related to the water activation due to the 16N and 17N isotopes and the impact on the primary heat transfer systems have been investigated providing guidelines and dedicated solution for the integration of safety devices…

TechnologyNuclear engineeringintegration issuesBreeding blanket; Integration issues; Water activation; Tritium management; VVPSSchemistry.chemical_elementIsolation valveSystem safetyBlanketTritium01 natural sciences010305 fluids & plasmasVVPSS0103 physical sciencesFusion reactors -- Design and constructionGeneral Materials Science010306 general physicswater activationSettore ING-IND/19 - Impianti NucleariHeliumCivil and Structural EngineeringIntegrated designbreeding blanket; integration issues; tritium management; VVPSS; water activationbreeding blanketMechanical EngineeringWater -- Thermal propertiesCoolanttritium managementNuclear Energy and EngineeringchemistryHeat transferEnvironmental scienceHelium -- Thermal propertiesPlant designddc:600Power-plants -- Design and construction