The cost of green roofs disposal in a life cycle perspective: covering the gap.
2012
Abstract This study is aimed at providing a contribution in overcoming the current gap, especially in Life Cycle Costing (LCC) and Benefit – Cost (BCA) analyses, due to the lack concerning the green roof disposal costs. Therefore, we have applied to an actual extensive green roof the LCC methodology suggested by D. G. Woodward (that appears like one of the most formalized and generalizable), but we have extended the analysis to the disposal phase. This will allow a complete and proper application of the LCC methodology in order of achieving an economic accounting of this component through its life cycle. In this way, it is possible to achieve the complete evaluation of the “green roof” perf…
Cloudy with a Chance of Fuzzy: Building a Multicriteria Uncertainty Model for Construction Project Delivery Selection
2017
AbstractThe process of choosing a project delivery method is infused with cognitive uncertainties associated with the decision maker. Fuzzy uncertainties arise because of imprecise understanding and subsequent representation of these uncertainties by the decision maker, whereas random uncertainties arise from variance of these imprecisions. Since there are no well-defined rules for spontaneous decisions, in order to be consistently confident in the appropriateness of the chosen delivery method, a structured approach incorporating uncertainty is required. Previously unanswered questions such as (1) what are the sources of uncertainty in project delivery decisions, (2) how do decision makers …
Fortifying the Island at the time of the viceroy Ferrante Gonzaga (1536-1546): sites, master builders and designers, clients
2015
Abstract The ten-year government of Ferrante Gonzaga marks a crucial time in the process of modernization of fortifications on the largest island of the Western Mediterranean. Even if the cornerstones of the strategy pursued and the projects undertaken to realize an adequate defense system have already been highlighted by previous studies, and it is well-known how much the viceroy himself and the royal engineer Antonio Ferramolino participated in resolving the longstanding problem, new interesting data emerge from research on the archival collections of Tribunale del Real Patrimonio, kept in the State Archive of Palermo. Using this mostly unpublished documentation, the paper focus on buildi…
Leadership and employees’ perceived safety behaviours in a nuclear power plant: A structural equation model
2011
Leadership is considered an essential element in guaranteeing the safe running of organizations. The purpose of the present study is to find out how leader behaviours influence employees' safety behaviours (perceived safety behaviours) in the nuclear field. In an attempt to answer this question, the authors of this research have considered the way this influence is exercised, taking into consideration some important factors like safety culture and safety climate. To achieve this, the empowerment leadership model, based on a behavioural approach to leadership, was used. The sample was made up of 566 employees from a Spanish nuclear power plant. The results indicated that when safety culture …
Multicriteria evaluation of sustainable energy solutions for Colosseum
2017
Abstract Colosseum is a large office building in the capital region of Finland. The building owner operates on the highly competitive office rental market. With increasing emphasis on environmental responsibility, energy efficiency and sustainable energy solutions can provide competitive edge on the rental market. This study evaluates in terms of multiple criteria different alternatives to enhance the energy solutions of the building. The alternatives included different configurations of solar power, ground source heat, and roof constructions, along with district heating. Decision criteria included internal rate of return, energy efficiency, CO2 emissions, and attractiveness. Attractiveness…
Vibration control for adjacent structures using local state information
2014
In this paper, a novel strategy for structural vibration control of multi-structure systems is presented. This strategy pays particular attention to mitigating negative interstructure interactions. Moreover, it is based on recent advances in static output–feedback control, which make possible the efficient computation of decentralized velocity-feedback controllers by solving a single-step optimization problem with Linear Matrix Inequality constraints. To illustrate the main ideas, a local velocity-feedback energy-to-peak controller is designed for the seismic protection of a two-building system. This controller is remarkably effective and extremely simple. Moreover, it can also be implement…
Passive-damping design for vibration control of large structures
2013
In this work, a systematic strategy to design passive damping systems for structural vibration control is presented. The proposed design methodology is based on the equivalence between decentralized static velocity-feedback controllers and passive damping systems. By using recent developments in static output-feedback control, the design of passivedamping systems can be formulated as a single optimization problem with Linear Matrix Inequality constraints. Moreover, this optimization problem can be efficiently solved with standard numerical tools, even for large dimension systems. Due to its computational effectiveness, the proposed methodology can be applied to the design of passive damping…
An execution, monitoring and replanning approach for optimal energy management in microgrids
2011
abstract This work develops a new approach for optimal energy management of electrical distribution ‘smart-grids’. Optimality aims at improving sustainability through the minimization of carbon emissions and atreducing production costs and maximizing quality. Input data are the forecasted loads and productionsfrom renewable generation units, output data are a set of control actions for the actuators. Theconsidered electrical distribution system includes storage units that must be considered over a 24 h timeinterval, to consider an entire charge and discharge cycle. The objectives for the optimal management ofdistributed (renewables and not) generation are technical, economical and environme…
A Mixed Approach for Determination of Initial Cable Forces in Cable-Stayed Bridges and the Parameters Variability
2015
The determination of initial cable forces in cable-stayed bridges is an important first step in design and analysis of the structure under external loads. Adjustments of stay forces are often required during construction in order to assure the requested behaviour of the bridge in terms of final geometrical configuration and internal force distribution. An accurate assessment of the stay tensioning system allows designers to obtain a good result at the end of construction, by considering the parameters involved as deterministic quantities, assuring the observance of the execution tolerances during works. Actual loads and their variations need instead a stochastic approach which can give usef…
A novel solar-geothermal trigeneration system integrating water desalination: Design, dynamic simulation and economic assessment
2016
Abstract In this paper, an innovative solar-geothermal polygeneration system is investigated. The system supplies a small community with electricity, desalinated water and space heating and cooling through a district network. The hybrid multi-purpose plant, based on an Organic Rankine Cycle (ORC) supplied by medium-enthalpy geothermal energy and by solar energy; this latter is provided by Parabolic Trough Collectors (PTC). The geothermal brine is first used to drive the ORC loop, then to provide space heating at around 85÷90 °C (in the winter), or cooling (in the summer, by means of a single-effect absorption chiller). Finally, the geothermal brine drives a Multi-Effect Distillation (MED) s…