Assessment of process stability and capability in a manufacturing organization: a case study

2021

Quality is considered asthe principal factor that determines the long-termsuccess or failure of any organization. Organizations perform quality control by monitoring process output using Statistical Quality Control, performed as part of the production process (Statistical Process Control, SPC) or as a final quality control check (Acceptance Sampling).SPC is a major quality management statistical tool and its instruments (control charts and capability analysis) are applied to virtually any type of organization (manufacturing, services or transactions - for example, those involving data, communications, software, or movement of materials). The aim of this paper is to present a case study, rea…

Quality managementbusiness.industryProcess (engineering)media_common.quotation_subjectAutomotive industryStatistical process controlEngineering (General). Civil engineering (General)Manufacturing engineeringAcceptance samplingNew product developmentQuality (business)Control chartTA1-2040businessmedia_commonMATEC Web of Conferences
researchProduct

Project monitoring by dynamic statistical control charts

2020

Project monitoring activities are fundamental to assure a timely identification of unacceptable project's deviations from the baseline, so that corrective actions may be taken to bring the project back in line with its objectives. Regarding this, the most used approach is the Earned Value Management (EVM) technique. However, traditional EVM metrics do not allow the Project Manager (PM) to recognize if project deviations are due to the natural project variability or to systemic and undiscovered causes that are moving the project to unacceptable out-of-controls. With this recognition, a statistical project control system based on the use of dynamic Shewhart's and CUmulative SUM (CUSUM) contro…

Settore ING-IND/17 - Impianti Industriali MeccaniciShewhart's and CUSUM control chartsDynamic control chartsProject monitoringEarned value management
researchProduct

A Bayesian Sequential Look at u-Control Charts

2005

We extend the usual implementation of u-control charts (uCCs) in two ways. First, we overcome the restrictive (and often inadequate) assumptions of the Poisson model; next, we eliminate the need for the questionable base period by using a sequential procedure. We use empirical Bayes(EB) and Bayes methods and compare them with the traditional frequentist implementation. EB methods are somewhat easy to implement, and they deal nicely with extra-Poisson variability (and, at the same time, informally check the adequacy of the Poisson assumption). However, they still need the base period. The sequential, full Bayes approach, on the other hand, also avoids this drawback of traditional u-charts. T…

Statistics and ProbabilityApplied MathematicsBayesian probabilityPoisson distributioncomputer.software_genreStatistical process controlsymbols.namesakeBayes' theoremOverdispersionFrequentist inferenceModeling and SimulationPrior probabilitysymbolsControl chartData miningcomputerMathematicsTechnometrics
researchProduct

Comparing the Economic Effectiveness of Various Adaptive Schemes for the c Chart

2013

In an attempt to improve the effectiveness of statistical process control (SPC) procedures, a variety of adaptive schemes has been developed in the last decades. However, considering control charts for attributes, relatively few works about adaptive schemes have been proposed, and most of them were proposed only recently. The common characteristic of those schemes is that one or more chart parameters are allowed to adaptively vary during the SPC operations according to the sampling information history, typically the current point plotted on the chart. In this way, the adaptive schemes are smarter than the related static ones, but they are also more complicated in terms of implementation. Th…

c-chartMathematical optimizationAdaptive samplingChartComputer scienceFractional factorial designSampling (statistics)Control chartManagement Science and Operations ResearchSafety Risk Reliability and QualityStatistical process controlShewhart individuals control chartReliability engineeringQuality and Reliability Engineering International
researchProduct

An Effective Double Sampling Scheme for thecControl Chart

2013

In the present paper is developed a statistical process control inspection procedure based on a new simple-to-implement and effective double sampling scheme for the c control chart, aimed at the minimization of the number of inspected observation units and warranting fixed levels for the type I and II error risks. In particular, the formulations of the false alarm risk α, the power P of the chart, and the expected number of inspected observation units for the developed inspection procedure are given, whereas a macro of Microsoft Excel is adopted to solve the tackled problem. In order to illustrate the application of the developed approach and to investigate on the influence of several opera…

c-chartMathematical optimizationChartComputer scienceControl chartFalse alarmMinificationManagement Science and Operations ResearchMacroSafety Risk Reliability and QualityStatistical process controlShewhart individuals control chartReliability engineeringQuality and Reliability Engineering International
researchProduct

Economic Design Approach for an SPC Inspection Procedure Implementing The Adaptive C Chart

2013

The present paper proposes a design approach for a statistical process control (SPC) procedure implementing a c control chart for non-conformities, with the aim to minimize the hourly total quality-related costs. The latter take into account the costs arising from the non-conforming products while the process is in-control and out-of-control, for false alarms, for assignable cause locations and system repairs, for sampling and inspection activities and for the system downtime. The proposed economic optimization approach is constrained by the expected hourly false alarms frequency, as well as the available labor resource level. A mixed integer non-linear constrained mathematical model is dev…

c-chartMathematical optimizationDowntimeOptimization problemFrank–Wolfe algorithmOperations researchComputer scienceControl chartManagement Science and Operations ResearchSolverSafety Risk Reliability and QualityStatistical process controlInteger (computer science)Quality and Reliability Engineering International
researchProduct

Characterisation and optimal design of a new double sampling <i>c</i> chart

2019

This paper proposes a new double sampling scheme for c control chart (DS-c), which was designed to improve the performance of c chart or to reduce the inspection cost. The mathematical expression required to do an exact evaluation of ARL and ASN is deduced. Further, a bi-objective genetic algorithm is implemented to obtain the optimal design of the DS-c scheme. This optimisation is aimed to simultaneously minimising the error probability type II and the ASN, guaranteeing a desired level for the error probability type I. A performance comparison between the double sampling (DS), fixed parameters (FP), variable simple size (VSS) and exponential weighted moving average (EWMA) schemes for the c…

c-chartOptimal design0209 industrial biotechnology02 engineering and technologyStatistical process controlIndustrial and Manufacturing EngineeringReduction (complexity)Variable (computer science)020901 industrial engineering & automationGenetic algorithmControl chartEWMA chartAlgorithmMathematicsEuropean J. of Industrial Engineering
researchProduct

An Effective Double Sampling Scheme for the c Control Chart

2015

In the present paper is developed a statistical process control inspection procedure based on a new simple-to-implement and effective double sampling scheme for the c control chart, aimed at the minimization of the number of inspected observation units and warranting fixed levels for the type I and II error risks. In particular, the formulations of the false alarm risk α, the power P of the chart, and the expected number of inspected observation units for the developed inspection procedure are given, whereas a macro of Microsoft Excel is adopted to solve the tackled problem. In order to illustrate the application of the developed approach and to investigate on the influence of several opera…

control chart for attributeexpected number of inspected observation unitstatistical process controlc control chartadaptive c control chart
researchProduct

Comparing the Economic Effectiveness of Various Adaptive Schemes for the c Chart

2014

In an attempt to improve the effectiveness of statistical process control (SPC) procedures, a variety of adaptive schemes has been developed in the last decades. However, considering control charts for attributes, relatively few works about adaptive schemes have been proposed, and most of them were proposed only recently. The common characteristic of those schemes is that one or more chart parameters are allowed to adaptively vary during the SPC operations according to the sampling information history, typically the current point plotted on the chart. In this way, the adaptive schemes are smarter than the related static ones, but they are also more complicated in terms of implementation. Th…

control chart for attributelabor resourcestatistical process controlnon-linear mathematical programming modelTaguchi’s loss functionSettore ING-IND/16 - Tecnologie E Sistemi Di Lavorazione
researchProduct

Economic design approach for a SPC inspection procedure implementing the adaptive c chart

2014

The present paper proposes a design approach for a statistical process control (SPC) procedure implementing a c control chart for non-conformities, with the aim to minimize the hourly total quality-related costs. The latter take into account the costs arising from the non-conforming products while the process is in-control and out-of-control, for false alarms, for assignable cause locations and system repairs, for sampling and inspection activities and for the system downtime. The proposed economic optimization approach is constrained by the expected hourly false alarms frequency, as well as the available labor resource level. A mixed integer non-linear constrained mathematical model is dev…

control chart for attributelabor resourcestatistical process controlnon-linear mathematical programming modelTaguchi’s loss functionSettore ING-IND/16 - Tecnologie E Sistemi Di Lavorazione
researchProduct