Methodologies for the Exploitation of Existing Energy Corridors. GIS Analysis and DTR Applications
2018
The exploitation of power lines currently in operation has now become a common practice among electric system operators. The construction of new power lines requires taking economic, political and social problems into consideration. This paper considers two methodologies adopted by the Italian Transmission System Operator (TSO), Terna S.p.A.: Dynamic Thermal Rating (DTR) and Laser Imaging Detection and Ranging-Geographic Information System (L-GIS). DTR systems dynamically calculate the real transport capacity of a power line. The L-GIS system allows, after the geo-referencing of the power line, the management of any interference between the line and the nearby obstacles, permitting the opti…
FPGA-based concurrent watchdog for real-time control systems
2003
A straightforward and efficient implementation of a custom concurrent watchdog processor for real-time control systems is presented. Emphasis is given to the techniques used for on-line checking the main processor activity without adding overhead, and to the advantages of a field programmable gate array implementation.
Leveraging a Wiki to EnhanceVirtual Collaboration in the Emergency Domain
2008
In a crisis situation, critical success factors include good preparedness, the availability of trustworthy information and reliable people, and the responders' ability to improvise with the available, functioning tools. Wikis can be used as collaborative group support systems to support these activities, especially for communities of practice that must operate as high reliability organizations. The advantages of using a wiki are especially beneficial in volatile environments, such as those in the emergency domain, where critical real-time decision making is required. An international wiki emergenciWiki.org - has been created and is being used by both practitioners and academics. The conclus…
Randomized renaming in shared memory systems.
2021
Abstract Renaming is a task in distributed computing where n processes are assigned new names from a name space of size m . The problem is called tight if m = n , and loose if m > n . In recent years renaming came to the fore again and new algorithms were developed. For tight renaming in asynchronous shared memory systems, Alistarh et al. describe a construction based on the AKS network that assigns all names within O ( log n ) steps per process. They also show that, depending on the size of the name space, loose renaming can be done considerably faster. For m = ( 1 + ϵ ) ⋅ n and constant ϵ , they achieve a step complexity of O ( log log n ) . In this paper we consider tight as well as loos…
A device for spike train sampling with built-in memory.
1987
Abstract The described interface to a digital computer measures interspike interval durations with a resolution of 10 μs. A built-in first-in first-out (FIFO) memory relieves the host computer from frequent I/O intensive tasks. The internal FIFO buffer can store up to 512 data words (wordlength is 16 bit) and works on the dual-port principle. This way the acquisition of a neuronal spike train is completely independent of the computer's simultaneously ongoing data access. A simple handshake protocol between the interface and the computer prevents any overhead communication. The buffer architecture of the instrument releases the host computer from high speed I/O handling schemes like real-tim…
Distribution of Ground Fault Current in Substations Fed by a Combined Overhead-Cable Line
2005
When a substation is fed by a combined overhead-cable transmission line, in case of a fault to ground within the substation a consistent part of the fault current flows through the cable sheaths toward the remote source and discharges into the earth at the transition station, where cables are connected to the overhead line. This phenomenon, named "fault application transfer", may result in high ground potentials at the transition station which may cause shocks and equipment damage. In this paper a simple but accurate method on modelling a combined overhead-cable line is presented, allowing the computation of the fault current transferred at the transition station. Numerical analysis shows t…
Intrusion Detection and Ejection Framework Against Lethal Attacks in UAV-Aided Networks: A Bayesian Game-Theoretic Methodology
2017
International audience; Advances in wireless communications and microelectronics have spearheaded the development of unmanned aerial vehicles (UAVs), which can be used to augment a ground network composed of sensors and/or vehicles in order to increase coverage, enhance the end-to-end delay, and improve data processing. While UAV-aided networks can potentially find applications in many areas, a number of issues, particularly security, have not been readily addressed. The intrusion detection system is the most commonly used technique to detect attackers. In this paper, we focus on addressing two main issues within the context of intrusion detection and attacker ejection in UAV-aided networks…
Analysis of ground fault current distribution along nonuniform multi-section lines
2008
In case of a substation supplied by a combined overhead-cable line, most of the ground fault current flows through the cable sheaths and discharges into the soil surrounding the point of discontinuity, where cables are connected to the overhead line. In the paper a new method is presented for computing the ground fault current distribution in case of feeding line consisting of two or more different sections, i.e. part overhead and part underground cable. Besides the calculation of the earth current at the fault location, the leakage current at the transit/transition stations as well as at the overhead line towers can be evaluated, in order to ensure proper safety conditions. Based on the tw…
Efficient modeling of a combined overhead cable line for grounding-system analysis
2008
Simple compact models for combined overhead-cable lines supplying a substation are presented as an extension of a previous paper for grounding system analysis. The overhead line section can be equipped with uniform or combined ground wires, whereas the cable line section can consist of coated metal sheathed cables, with/without intermediate grounding, or uncoated metal sheathed cables in continuous contact with the earth. Besides the calculation of the earth current at the faulted substation, the proposed modeling method allows the evaluation of the leakage current at the transition station, where cables are connected to the overhead line, as well as at critical overhead line towers. In thi…
Experimental investigation on PLC signal crossing of power transformers
2014
In this work the use of PLC in MV-LV networks is investigated, by means of experimental tests in the case of a two-ways MV/LV communication between two secondary substations. The two substations are connected by a MV overhead power line. Moreover each substation has a by-pass connection at MV bus-bars and a MV/LV power transformer. A ST7580 transceiver is used to inject the communication signal. The transceiver is embedded in a new interface device developed by the authors. In the paper the communication issues are introduced and some experimental tests are presented and discussed. Such tests have been carried out in the presence of voltage net, i.e. 24 kV, with the aim to verify the possib…