Comment on “A simple way to incorporate uncertainty and risk into forest harvest scheduling”
2017
In a recent research article, Robinson et al. (2016) described a method of estimating uncertainty of harvesting outcomes by analyzing the historical yield to the associated prediction for a large number of harvest operations. We agree with this analysis, and consider it a useful tool to integrate estimates of uncertainty into the optimization process. The authors attempt to manage the risk using two different methods, based on deterministic integer linear programming. The first method focused on maximizing the 10th quantile of the distribution of predicted volume subject to area constraint, while the second method focused on minimizing the variation of total quantity of volume harvested sub…
Regenerative scheduling problem in engineer to order manufacturing: an economic assessment
2021
The dynamic production scheduling is a very complex process that may arise from the occurrence of unpredictable situations such as the arrival of new orders besides the ones already accepted. As a consequence, companies may often encounter several difficulties to make decisions about the new orders acceptance and sequencing along with the production of the existing ones. With this recognition, a mathematical programming model for the regenerative scheduling problem with deterministic processing times is formulated in the present paper to evaluate the economic advantage of accepting a new order in an engineer to order (ETO) manufacturing organization. The real case of an Italian ETO company …
Optimization Model to Extend Existing Production Planning and Control Systems for the Use of Additive Manufacturing Technologies in the Industrial Pr…
2018
Abstract The use of additive manufacturing technologies for industrial production is constantly growing. This technology differs from the known production procedures. The areas of scheduling, detailed and sequence planning are particularly important for additive production due to the long print times and flexible use of the production area. Therefore, production-relevant variables are considered and used for the production planning and control (PPC) of additive manufacturing machines. For this purpose, an optimization model is presented which shows a time-oriented build space utilization. In the implementation, a nesting algorithm is used to check the combinability of different models for e…
Multi-criteria analysis applied to multi-objective optimal pump scheduling in water systems
2019
Abstract This work presents a multi-criteria-based approach to automatically select specific non-dominated solutions from a Pareto front previously obtained using multi-objective optimization to find optimal solutions for pump control in a water supply system. Optimal operation of pumps in these utilities is paramount to enable water companies to achieve energy efficiency in their systems. The Fuzzy Technique for Order of Preference by Similarity to Ideal Solution (FTOPSIS) is used to rank the Pareto solutions found by the non-dominated sorting genetic algorithm (NSGA-II) employed to solve the multi-objective problem. Various scenarios are evaluated under leakage uncertainty conditions, res…
Implementation of a Management System for Prosumer Energy Storage Scheduling in Smart Grids
2020
Scheduling of energy storage systems of distributed generation is a key element for optimal renewable energy sources (RES) exploitation in smart grids, demand side response strategies implementation and prosumers interaction with Distribution System Operators (DSOs). In this context, this paper presents the implementation of a management system for energy storage scheduling, which allows taking appropriate account of the storage system behavior in real cases. To properly consider the real system operation, the employed battery model is modified, in order to include also the hysteresis phenomena in state of charge estimation in both charging and discharging operation. The validation of the p…
Ranking and comparing key factors causing time-overruns in on-site construction
2022
For years, the construction industry has looked for ways to avoid time-overruns in construction. Despite previous research mapping the factors affecting time performance, site-managers have difficulties in reducing the time-overrun. In order to create a clearer guidance on how to control time-performance, this study investigates the resource related factors because they are within the site-manager’s control. Three Case studies were followed and a survey including 36 participants where conducted. Both investigated and ranked the likelihood of delay due to the seven different resource factors. The ranking of the resource factors was identified as: (1) Construction design, (2) Connecting works…
Operation management in reconfigurable manufacturing systems: Reconfiguration for error handling
2006
Abstract Reconfigurable manufacturing systems offer quick adjustment of production capacity and functionality in response to unpredictable market changes as being systems designed at the outset for rapid change in system configuration, its machines and controls. During the production process, out-of-ordinary events occur dynamically and unpredictably both at the system (machine breakdowns, change in job's priorities, etc.) and at the cell level (tool failures, robot collisions, etc.). Such exceptions interrupt the production process by causing errors in the schedule plan (system level) or in the task plan (cell level). Error handling is the policy meant for reacting to errors caused by the …
2014
This paper presents a mathematical model for robust production planning. The model helps fashion apparel suppliers in making decisions concerning allocation of production orders to different production plants characterized by different lead times and production costs, and in proper time scheduling and sequencing of these production orders. The model aims at optimizing these decisions concerning objectives of minimal production costs and minimal tardiness. It considers several factors such as the stochastic nature of customer demand, differences in production and transport costs and transport times between production plants in different regions. Finally, the model is applied to a case study.…
Integrated Approach to Part Scheduling and Inspection Policies for a Job Shop Manufacturing System
2007
The quality of a product greatly depends on the quality of its components. This requires that manufacturing specifications have to be met in the manufacturing environment and as a consequence inspection stations are present in many manufacturing systems and inspection policies must be adopted. One problem, which has been widely investigated, concerns the detection of the inspection points in the hypothesis that the action to be taken is known when a defective part is detected. If different jobs are to be produced, then operation scheduling becomes yet another complex problem needing to be solved. And while the problem of scheduling has received a great amount of attention from researchers, …
Technique of Statistical Validation of Rival Models for Fatigue Crack Growth Process and Its Identification
2011
The development of suitable models of stochastic crack growth process is important for the reliability analysis of fatigued structures as well as the scheduling of inspection and repair/replacement maintenance. Based on modifications of the solution of the deterministic differential equation for the crack growth rate, where a stochastic nature of this rate is expressed by a random disturbance embedded in the solution of the differential equation, the simple stochastic models are presented for practical applications. Each of these models represents a stochastic version of the solution of the Paris-Erdogan law equation. The models take into account the random disturbance parameters while main…