Search results for "Run-of-river"
showing 2 items of 2 documents
Identification of Potential Locations for Run-of-River Hydropower Plants Using a GIS-Based Procedure
2019
The increasing demand for renewable and sustainable energy sources has encouraged the development of small run-of-river plants. Preliminary studies are required to assess the technical and economic feasibility of such plants. In this context, the identification of optimal potential run-of-river sites has become a key issue. In this paper, an approach that is based on GIS tools coupled with a hydrological model has been applied to detect potential locations for a run-of-river plant. A great number of locations has been analyzed to identify those that could assure the achievement of different thresholds of potential power. The environmental and economic feasibility for small hydropower projec…
Selecting a small run-of-river hydropower plan by the analytic hierarchy process (AHP): A case study of Miño-Sil river basin, Spain
2015
Hydroelectric power is obtained by harnessing the potential energy of a mass of water flowing along a river bed to convert it first into mechanical and then into electrical energy. The system is therefore both clean and autonomous and has a high potential for development. A small hydropower plant has an installed power capacity of below 10 MW and is considered run-of-river when it diverts part of a river flow to generate its electricity. The use of multicriteria techniques in environmental decision making, including selecting between various alternatives, is important when it involves complex decisions in a number of disciplinary fields. The most widely used of these techniques is the analy…