Search results for "Uncertainty"

showing 10 items of 1010 documents

Uncertainty assessment of a membrane bioreactor model using the GLUE methodology

2010

A mathematical model for the simulation of physical-biological organic removal by means of a membrane bioreactor (MBR) has been previously developed and tested. This paper presents an analysis of the uncertainty of the MBR model. Particularly, the research explores the applicability of the Generalised Likelihood Uncertainty Estimation (GLUE) methodology that is one of the most widely used methods for investigating the uncertainties in the hydrology and that now on is spreading in other research field. For the application of the GLUE methodology, several Monte Carlo simulations have been run varying the all model influential parameters simultaneously. The model was applied to an MBR pilot pl…

EngineeringEnvironmental EngineeringSettore ICAR/03 - Ingegneria Sanitaria-AmbientaleMathematical modelbusiness.industrySettore ICAR/02 - Costruzioni Idrauliche E Marittime E IdrologiaMonte Carlo methodBiomedical EngineeringBackwashingBioengineeringMembrane bioreactorMathematical modelPilot plantRobustness (computer science)Data qualityASMMembrane bioreactorUncertainty assessmentProcess engineeringbusinessGLUEBiotechnologyBiochemical Engineering Journal
researchProduct

A Dempster-Shafer Theory-based approach to the Failure Mode, Effects and Criticality Analysis (FMECA) under epistemic uncertainty: application to the…

2017

Abstract Failure Mode and Effects Analysis (FMEA) is a safety and reliability analysis tool widely used for the identification of system/process potential failures, their causes and consequences. When aimed at the failure modes prioritization, FMEA is named Failure Mode, Effects and Criticality Analysis (FMECA). In the latter case, failure modes are commonly prioritized by means of the Risk Priority Number (RPN) that has been widely criticized to have several shortcomings. Firstly, in the presence of multiple experts supplying different and uncertain judgments on risk parameters, RPN is not able to deal with such a kind of information. Therefore, the present paper proposes the Dempster-Shaf…

EngineeringEpistemic uncertainty021103 operations researchFailure modes prioritizationbusiness.industryProcess (engineering)0211 other engineering and technologiesDempster-Shafer Theory02 engineering and technologyInterval (mathematics)Industrial and Manufacturing EngineeringReliability engineeringIdentification (information)Propulsion systemFailure mode effects and criticality analysisDempster–Shafer theorySettore ING-IND/17 - Impianti Industriali Meccanici0202 electrical engineering electronic engineering information engineering020201 artificial intelligence & image processingUncertainty quantificationSafety Risk Reliability and QualitybusinessFailure mode and effects analysisReliability (statistics)FMECAReliability Engineering & System Safety
researchProduct

Uncertainty estimation of a complex water quality model: The influence of Box–Cox transformation on Bayesian approaches and comparison with a non-Bay…

2012

Abstract In urban drainage modelling, uncertainty analysis is of undoubted necessity. However, uncertainty analysis in urban water-quality modelling is still in its infancy and only few studies have been carried out. Therefore, several methodological aspects still need to be experienced and clarified especially regarding water quality modelling. The use of the Bayesian approach for uncertainty analysis has been stimulated by its rigorous theoretical framework and by the possibility of evaluating the impact of new knowledge on the modelling predictions. Nevertheless, the Bayesian approach relies on some restrictive hypotheses that are not present in less formal methods like the Generalised L…

EngineeringIntegrated urban drainage systemSettore ICAR/03 - Ingegneria Sanitaria-Ambientalebusiness.industryWastewater treatment plantBayesian probabilityBayesian inferencePower transformBayesian inferenceGeophysicsGeochemistry and PetrologyHomoscedasticityStatisticsWater-quality modellingEconometricsGeneralised Likelihood Uncertainty Estimation (GLUE)Sensitivity analysisReceiving water bodybusinessLikelihood functionGLUEUncertainty analysis
researchProduct

Assessment of data and parameter uncertainties in integrated water-quality model

2011

In integrated urban drainage water quality models, due to the fact that integrated approaches are basically a cascade of sub-models (simulating sewer system, wastewater treatment plant and receiving water body), uncertainty produced in one sub-model propagates to the following ones depending on the model structure, the estimation of parameters and the availability and uncertainty of measurements in the different parts of the system. Uncertainty basically propagates throughout a chain of models in which simulation output from upstream models is transferred to the downstream ones as input. The overall uncertainty can differ from the simple sum of uncertainties generated in each sub-model, dep…

EngineeringMathematical optimizationEnvironmental EngineeringWaste Disposal FluidWater MovementsDecomposition (computer science)Sensitivity analysisUpstream (networking)Citiesreceiving water bodywastewater treatment plantUncertainty analysisWater Science and TechnologyPropagation of uncertaintySettore ICAR/03 - Ingegneria Sanitaria-Ambientalebusiness.industryenvironmental modellingUncertaintyWaterintegrated urban drainage systemModels TheoreticalItalyCascadeVariance decomposition of forecast errorsSanitary Engineeringuncertainty analysibusinessEnvironmental MonitoringWaste disposalWater Science and Technology
researchProduct

A composite indicator for water meter replacement in an urban distribution network

2012

In water supply management, volumetric water meter are typically used to measure users' consumption. With water meters, utilities can collect useful data for billing, assess the water balance of the system, and identify failures in the network, water theft and anomalous user behaviour. Despite their importance, these instruments are characterised by intrinsic errors that cause so-called apparent losses. The complexity of the physical phenomena associated with metering errors in aging water meters does not allow meter replacement to be guided by single parameters, such as the meter age or the total volume passed through the meter. This paper presents a meter replacement strategy based on a c…

EngineeringMeasure (data warehouse)business.industryComputingMethodologies_MISCELLANEOUSGeography Planning and DevelopmentWater supplycomposite indicatorReliability engineeringWater balanceapparent lossewater meterHardware_GENERALRobustness (computer science)MetreMetering modebusinessuncertainty analysismetering errorReliability (statistics)Uncertainty analysisSimulationWater Science and TechnologyUrban Water Journal
researchProduct

Sensitivity and uncertainty analysis of an integrated membrane bioreactor model

2015

Sensitivity and uncertainty analysis, although can be of primarily importance in mathematical modelling approaches, are scarcely applied in the field of membrane bioreactor (MBR). An integrated mathematical model for MBR is applied with the final aim to pin down sources of uncertainty in MBR modelling. The uncertainty analysis has been performed combining global sensitivity analysis (GSA) with the generalized likelihood uncertainty estimation (GLUE). The model and methodology were applied to a University Cape Town pilot plant. Results show that the complexity of the modelled processes and the propagation effect from the influent to the effluent increase the uncertainty of the model predicti…

EngineeringModel prediction0208 environmental biotechnologyOcean Engineering02 engineering and technologyWastewater modelling010501 environmental sciencesMembrane bioreactor01 natural sciencesGlobal sensitivity analysis; Membrane bioreactors; Uncertainty analysis; Wastewater modelling; Pollution; Water Science and Technology; Ocean EngineeringGlobal sensitivity analysisUncertainty estimationSensitivity (control systems)GLUEUncertainty analysis0105 earth and related environmental sciencesWater Science and TechnologySettore ICAR/03 - Ingegneria Sanitaria-Ambientalebusiness.industryUncertainty analysiEnvironmental engineeringGlobal sensitivity analysiPollution020801 environmental engineeringPilot plantMembrane bioreactorBiochemical engineeringbusinessDesalination and Water Treatment
researchProduct

A DAQ-based sampling wattmeter for IEEE Std. 1459-2010 powers measurements. Uncertainty evaluation in nonsinusoidal conditions

2015

Abstract This paper presents the evaluation of the metrological performances of a DAQ-based sampling wattmeter (DAQ-SW) for the measurement of IEEE Std. 1459-2010 power quantities in non-sinusoidal conditions. The instrument makes use of two commercial data acquisition (DAQ) boards, a non-inductive current shunt, a personal computer and a commercial software for data processing. Starting from the results of an experimental characterization of the two instrument channels with non-sinusoidal voltages and currents and a correlation analysis, the combined standard uncertainties of IEEE Std. 1459-2010 quantities are evaluated, following the approach of the ISO Guide to the Expression of Uncertai…

EngineeringPC-based instrumentsHarmonic distortionlaw.inventionData acquisitionlawElectronic engineeringElectrical and Electronic EngineeringPower measurements IEEE Std. 1459-2010 Data acquisition Uncertainty Harmonic distortion PC-based instrumentsInstrumentationIEEE Std. 1459-2010Data processingTotal harmonic distortionCommercial softwarebusiness.industryApplied MathematicsElectrical engineeringUncertaintyData acquisitionWattmeterCondensed Matter PhysicsMetrologyPersonal computerMeasurement uncertaintybusinessSettore ING-INF/07 - Misure Elettriche E ElettronichePower measurements
researchProduct

Exploring the uncertainty in capacity estimation at roundabouts

2017

Abstract Purpose In gap-acceptance theory the critical and the follow-up headways have a significant role in determining roundabout entry capacities which in turn depend on circulating flow rates under a specified arrival headway distribution. Calculation considers single mean values of the gap-acceptance parameters, neglecting the inherent variations in these random variables and providing a single value of entry capacity. The purpose of this paper is to derive the entry capacity distribution which accounts for the variations of the contributing (random) variables and suggest how to consider this issue in the operational analysis of the roundabouts. Methods We performed a Monte Carlo simul…

EngineeringRoundaboutMonte Carlo methodTransportationProbability density function010501 environmental sciences01 natural sciencesGap-acceptance parameter0502 economics and businessHeadwayStatisticsOperationsSettore ICAR/04 - Strade Ferrovie Ed AeroportiPoint estimationSimulation0105 earth and related environmental sciences050210 logistics & transportationbusiness.industryMechanical Engineering05 social sciencesEntry capacityUncertaintylcsh:TA1001-1280lcsh:HE1-9990Distribution (mathematics)Roundabout entry capacity gap-acceptance parameter operations uncertaintyAutomotive EngineeringRoundaboutProbability distributionlcsh:Transportation engineeringlcsh:Transportation and communicationsbusinessRandom variableEuropean Transport Research Review
researchProduct

Uncertainty assessment of a model for biological nitrogen and phosphorus removal: Application to a large wastewater treatment plant

2012

Abstract In the last few years, the use of mathematical models in WasteWater Treatment Plant (WWTP) processes has become a common way to predict WWTP behaviour. However, mathematical models generally demand advanced input for their implementation that must be evaluated by an extensive data-gathering campaign, which cannot always be carried out. This fact, together with the intrinsic complexity of the model structure, leads to model results that may be very uncertain. Quantification of the uncertainty is imperative. However, despite the importance of uncertainty quantification, only few studies have been carried out in the wastewater treatment field, and those studies only included a few of …

EngineeringSettore ICAR/03 - Ingegneria Sanitaria-AmbientaleMathematical modelbusiness.industryNitrogen phosphorus removalMonte Carlo methodUncertainty analysiEnvironmental engineeringWastewater modellingGeophysicsGeochemistry and PetrologyData qualityCalibrationProbability distributionBiochemical engineeringUncertainty quantificationGLUEbusinessActivated-sludge modelReliability (statistics)Uncertainty analysisPhysics and Chemistry of the Earth, Parts A/B/C
researchProduct

Sensitivity analysis to quantify uncertainty in Life Cycle Assessment: The case study of an Italian tile

2011

Abstract The results of a Life Cycle Assessment (LCA) study can be affected by several uncertainty sources, mainly due to the methodological choices, the initial assumptions, i.e. allocation rules, system boundaries and impact assessment methods, and the quality of the available data. Then, the experts should estimate the extent of the above-mentioned sources of uncertainty for improving the reliability and the representativeness of the obtained eco-profiles. To estimate the uncertainty is necessary to obtain reliable, transparent and representative LCA results and to correctly support decision-makers in the selection of different product or process options. The following paper starts from …

EngineeringSettore ING-IND/11 - Fisica Tecnica AmbientaleOperations researchRenewable Energy Sustainability and the Environmentbusiness.industryImpact assessmentProcess (engineering)media_common.quotation_subjectLife Cycle Analysis (LCA) Sensitivity analysis Uncertainty Tiles Energy Environmental impactRepresentativeness heuristicReliability engineeringEnvironmental impact assessmentQuality (business)Sensitivity (control systems)businessLife-cycle assessmentReliability (statistics)media_common
researchProduct