A critical perspective on Integrated Project Delivery (IPD) applied in a Norwegian public hospital project
2020
Does the IPD concept deliver as required and expected, and if not, how can that be explained? This paper is a critical realist inspired methodology based on a combination of the inductive and deductive approaches used in case study research. IPD is based on relational contracting between multiple parties, in this case between the Owner, Contractor, MEP subcontractors and a group of Consulting engineers who share control of the project. At the core of the concept is shared risk and opportunities among the parties in the IPD contract. Our theoretical perspectives are based mainly on the Principal-Agent theory (PA), Transaction Cost theory (TC), and its related incentives. This paper reports o…
Continuous Improvement on Detailed Design Phase : A Process Perspective
2020
The construction project being studied is a government investment related to the relocation of a biomedical institute delivering research-based knowledge and contingency support in the fields of animal health, fish health and food safety. The project covers a total of 63,000 square meters distributed over 10 buildings with a very high degree of complexity. The design alone has required 1 million hours, which relates to a client cost of about 100 million Euro. The purpose of this paper is to study the applied methodology for managing the detailed design to identify lessons learned from the project. The theory underlying the study is inspired by lean design management and design theory linked…