Search results for "approximation error"

showing 2 items of 62 documents

Factor selection procedures in a Google Earthtm aided landslide susceptibility model: application to the Beiro river basin (Spain)

2011

A procedure to select the controlling factors connected to the slope instability has been defined. It allowed to assess the landslide susceptibility in the Rio Beiro basin (about 10 km2) over the north-eastern area of the city of Granada (Spain). Field and remote (Google EarthTM) recognition techniques allowed to generate a landslide inventory consisting in 127 phenomena. Univariate tests, using both association coefficients and validation results of single parameter susceptibility models, allowed to select among 15 controlling factors the ones that resulted as good predictor variables; these have been combined for unique conditions analysis and susceptibility maps were finally prepared. In…

multivariate landslide susceptibility models conditional analysis controlling factor selection model validation Google EarthTm.geography.geographical_feature_categorySettore GEO/04 - Geografia Fisica E GeomorfologiaUnivariateDrainage basinForecast skillLandslideLandslide susceptibilityField (geography)GeographyGoodness of fitApproximation errorStatisticsCartography
researchProduct

Scheduling under the network of temporo-spatial proximity relationships

2017

We discuss and introduce to the schedulingeld a novel, qualitative optimization model - scheduling under the network of temporo-spatial proximity relationships.We introduce a half perimeter proximity measure as an objective of scheduling.We present and evaluate an incremental Sequence Pair neighborhood evaluation algorithm, applicable to both scheduling and rectangle packing problems in VLSI industry. In this paper, we discuss and introduce to the scheduling field a novel optimization objective - half perimeter proximity measure in scheduling under the network of temporo-spatial proximity relationships. The presented approach enables to qualitatively express various reasons of scheduling ce…

proximity relationshipsMathematical optimizationGeneral Computer Sciencerectangle packing problemEvaluation algorithm0102 computer and information sciences02 engineering and technologyIntegrated circuitManagement Science and Operations Research01 natural scienceslaw.inventionScheduling (computing)lawApproximation error0202 electrical engineering electronic engineering information engineeringschedulingComputer Science::Operating SystemsMathematicsVery-large-scale integrationProximity measureneighborhood evaluation010201 computation theory & mathematicsModeling and Simulation020201 artificial intelligence & image processingsequence pairRectangle packingComputers & Operations Research
researchProduct