Search results for "c-chart"
showing 6 items of 6 documents
Economic Robustness Analysis of Adaptive Chart Schemes for Monitoring the Total Nonconformities Number in Inspection Units
2015
In recent years, a variety of enhanced schemes for the c chart have been developed aimed at the effectiveness improving of the related statistical process control (SPC) procedures. However, the performance of such chart schemes can be very sensitive to values assumed for some operating and cost parameters, in particular to the considered process shift magnitude arising from out-of-control conditions. In such a circumstance, the effectiveness of such chart schemes can be subjected to substantial reductions when they are implemented in operative contexts given that, in practice, such value is unknown and it can be very difficult to accurately estimate. For this reason, in the present paper i…
Economic Design Approach for an SPC Inspection Procedure Implementing The Adaptive C Chart
2013
The present paper proposes a design approach for a statistical process control (SPC) procedure implementing a c control chart for non-conformities, with the aim to minimize the hourly total quality-related costs. The latter take into account the costs arising from the non-conforming products while the process is in-control and out-of-control, for false alarms, for assignable cause locations and system repairs, for sampling and inspection activities and for the system downtime. The proposed economic optimization approach is constrained by the expected hourly false alarms frequency, as well as the available labor resource level. A mixed integer non-linear constrained mathematical model is dev…
An Effective Double Sampling Scheme for thecControl Chart
2013
In the present paper is developed a statistical process control inspection procedure based on a new simple-to-implement and effective double sampling scheme for the c control chart, aimed at the minimization of the number of inspected observation units and warranting fixed levels for the type I and II error risks. In particular, the formulations of the false alarm risk α, the power P of the chart, and the expected number of inspected observation units for the developed inspection procedure are given, whereas a macro of Microsoft Excel is adopted to solve the tackled problem. In order to illustrate the application of the developed approach and to investigate on the influence of several opera…
A Multi-Objective Design Approach for the c Chart Considering Taguchi Loss Function
2013
The present paper proposes a multi-objective design approach for the c chart, considering in the optimization process of the chart parameters both the statistical and the economic objectives. In particular, the minimization of the hourly total quality related costs is the considered objective to carry out the economic goal, whereas the statistical objective is reached by the minimization the out-of-control average run length of the chart. A mixed integer non-linear constrained mathematical model is formulated to solve the treated multi-objective optimization problem, whereas the Pareto optimal frontier is described by the e-constraint method. In order to show the employment of the proposed …
Characterisation and optimal design of a new double sampling <i>c</i> chart
2019
This paper proposes a new double sampling scheme for c control chart (DS-c), which was designed to improve the performance of c chart or to reduce the inspection cost. The mathematical expression required to do an exact evaluation of ARL and ASN is deduced. Further, a bi-objective genetic algorithm is implemented to obtain the optimal design of the DS-c scheme. This optimisation is aimed to simultaneously minimising the error probability type II and the ASN, guaranteeing a desired level for the error probability type I. A performance comparison between the double sampling (DS), fixed parameters (FP), variable simple size (VSS) and exponential weighted moving average (EWMA) schemes for the c…
Comparing the Economic Effectiveness of Various Adaptive Schemes for the c Chart
2013
In an attempt to improve the effectiveness of statistical process control (SPC) procedures, a variety of adaptive schemes has been developed in the last decades. However, considering control charts for attributes, relatively few works about adaptive schemes have been proposed, and most of them were proposed only recently. The common characteristic of those schemes is that one or more chart parameters are allowed to adaptively vary during the SPC operations according to the sampling information history, typically the current point plotted on the chart. In this way, the adaptive schemes are smarter than the related static ones, but they are also more complicated in terms of implementation. Th…