Search results for "data structures"
showing 10 items of 258 documents
"Table 17" of "Search for a Heavy Neutral Particle Decaying to $e\mu$, $e\tau$, or $\mu\tau$ in $pp$ Collisions at $\sqrt{s}=8$ TeV with the ATLAS De…
2015
Cut flow for signal $\tilde{\nu}_{\tau}$ and Z' at 1TeV mass point.
A Constructive Arboricity Approximation Scheme
2020
The arboricity \(\varGamma \) of a graph is the minimum number of forests its edge set can be partitioned into. Previous approximation schemes were nonconstructive, i.e., they approximate the arboricity as a value without computing a corresponding forest partition. This is because they operate on pseudoforest partitions or the dual problem of finding dense subgraphs.
Analyticity of a restricted formality
2020
International audience; The Kontsevich formality can be viewed as a non-linear map ℱ from the L∞ algebra of poly-vector fields on ℝd to the space of poly-differential operators. The space of the half-homogenous poly-vector fields is a sub-L∞ algebra. We prove here that the restriction of ℱto this subspace is weakly analytic.
Scalar quark searches in $e^+ e^-$ collisions at $\sqrt{s}$ = 181-184 GeV
1998
Searches for scalar top, scalar bottom and degenerate scalar quarks have been performed with data collected with the ALEPH detector at LEP. The data sample consists of 57 pb^-1 taken at sqrt{s} = 181-184 GeV. No evidence for scalar top, scalar bottom or degenerate scalar quarks was found in the channels tilde{t} --> c chi, tilde{t} --> b l snu, tilde{b} --> b chi, and tilde{q} --> q chi. From the channel tilde{t} --> c chi a limit of 74 GeV/c^2 has been set on the scalar top quark mass, independent of the mixing angle. This limit assumes a mass difference between the stop and the chi in the range 10-40 GeV/c^2. From the channel tilde{t} --> b l snu the mixing-angle-indepen…
Search for pair production of the scalar top quark in muon+tau final states
2012
We present a search for the pair production of scalar top quarks ($\tilde{t}_{1}$), the lightest supersymmetric partners of the top quarks, in $p\bar{p}$ collisions at a center-of-mass energy of 1.96 TeV, using data corresponding to an integrated luminosity of {7.3 $fb^{-1}$} collected with the \dzero experiment at the Fermilab Tevatron Collider. Each scalar top quark is assumed to decay into a $b$ quark, a charged lepton, and a scalar neutrino ($\tilde{\nu}$). We investigate final states arising from $\tilde{t}_{1} \bar{\tilde{t}_{1}} \rightarrow b\bar{b}\mu\tau \tilde{\nu} \tilde{\nu}$ and $\tilde{t}_{1} \bar{\tilde{t}_{1}} \rightarrow b\bar{b}\tau\tau \tilde{\nu} \tilde{\nu}$. With no si…
Search for Pair Production of Supersymmetric Top Quarks in Dilepton Events frompp¯Collisions ats=1.96 TeV
2010
We present the results of a search for pair production of the supersymmetric partner of the top quark (the top squark (t) over tilde (1)) decaying to a b quark and a chargino (chi) over tilde (+/-)(1) with a subsequent (chi) over tilde (+/-)(1) decay into a neutralino (chi) over tilde (0)(1), lepton l, and neutrino nu Using a data sample corresponding to 2.7 fb(-1) of integrated luminosity of p (p) over bar collisions at root s = 1: 96 TeV collected by the CDF II detector, we reconstruct the mass of top squark candidate events and fit the observed mass spectrum to a combination of standard model processes and (t) over tilde (1)(t) over tilde (1). We find no evidence for (t) over tilde (1)(t…
Integrated Production and Predictive Maintenance Planning based on Prognostic Information
2019
International audience; This paper address the problem of scheduling production and maintenance operation in predictive maintenance context. It proposes a contribution in the decision making phase of the prognostic and health management framework. Theprognostics and decision processes are merged and an ant colony optimization approach for finding the sequence of decisions that optimizes the benefits of a production system is developed. A case study on a single machine composed of several components where machine can have several usage profiles. The results show thatour approach surpasses classical condition based maintenance policy.
Checkpointing Workflows for Fail-Stop Errors
2017
International audience; We consider the problem of orchestrating the exe- cution of workflow applications structured as Directed Acyclic Graphs (DAGs) on parallel computing platforms that are subject to fail-stop failures. The objective is to minimize expected overall execution time, or makespan. A solution to this problem consists of a schedule of the workflow tasks on the available processors and of a decision of which application data to checkpoint to stable storage, so as to mitigate the impact of processor failures. For general DAGs this problem is hopelessly intractable. In fact, given a solution, computing its expected makespan is still a difficult problem. To address this challenge,…
The Myriad Virtes of Wavelet Trees
2009
A new data structure, the wavelet tree, is analysied and discussed with particular attention to data compression
2D-Pattern Indexing
2008
Data Structures for two-dimensional pattern matching are presented and discussed.