Search results for "scheduling"

showing 10 items of 275 documents

LPV models: Identification for gain scheduling control

2001

In this paper the use of discrete-time Linear Parameter Varying (LPV) models for the gain scheduling control and identification methods for non-linear or time-varying system is considered. We report an overview on the existing literature on LPV systems for gain scheduling control and identification. Moreover, assuming that inputs, outputs and the scheduling parameters are measured, and a form of the functional dependence of the coefficients on the parameters is known, we show how the identification problem can be reduced to a linear regression so that a Least Mean Square and Recursive Least Square identification algorithm can be reformulated. Our methodology is applied for the identificatio…

EngineeringMathematical optimizationbusiness.industryGain scheduling control; identification for nonlinear systems; LPV models;Jet enginelaw.inventionScheduling (computing)Least mean squares filterParameter identification problemGain schedulingControl theoryRobustness (computer science)lawLinear regressionbusinessSurge control2001 European Control Conference (ECC)
researchProduct

Integrated Approach to Part Scheduling and Inspection Policies for a Job Shop Manufacturing System

2007

The quality of a product greatly depends on the quality of its components. This requires that manufacturing specifications have to be met in the manufacturing environment and as a consequence inspection stations are present in many manufacturing systems and inspection policies must be adopted. One problem, which has been widely investigated, concerns the detection of the inspection points in the hypothesis that the action to be taken is known when a defective part is detected. If different jobs are to be produced, then operation scheduling becomes yet another complex problem needing to be solved. And while the problem of scheduling has received a great amount of attention from researchers, …

EngineeringOperations researchJob-shop scheduling inspection policy genetic algorithmJob shopbusiness.industryStrategy and ManagementScheduling (production processes)Management Science and Operations ResearchIntegrated approachOperation schedulingManufacturing systemsOptimal controlSequential decisionIndustrial and Manufacturing EngineeringSettore ING-IND/17 - Impianti Industriali MeccanicibusinessSettore ING-IND/16 - Tecnologie E Sistemi Di Lavorazione
researchProduct

An execution, monitoring and replanning approach for optimal energy management in microgrids

2011

abstract This work develops a new approach for optimal energy management of electrical distribution ‘smart-grids’. Optimality aims at improving sustainability through the minimization of carbon emissions and atreducing production costs and maximizing quality. Input data are the forecasted loads and productionsfrom renewable generation units, output data are a set of control actions for the actuators. Theconsidered electrical distribution system includes storage units that must be considered over a 24 h timeinterval, to consider an entire charge and discharge cycle. The objectives for the optimal management ofdistributed (renewables and not) generation are technical, economical and environme…

EngineeringOptimization problemEnergy managementbusiness.industryMechanical EngineeringControl (management)Distributed energy resources management Multi-objective evolutionary optimization MicrogridsBuilding and ConstructionInterval (mathematics)PollutionIndustrial and Manufacturing EngineeringScheduling (computing)Reliability engineeringSettore ING-IND/33 - Sistemi Elettrici Per L'EnergiaGeneral EnergyProduction (economics)MinificationElectrical and Electronic EngineeringInterruptbusinessSimulationCivil and Structural Engineering
researchProduct

Multimedia applications in industrial networks: integration of image processing in profibus

2003

This paper analyzes the transmission of images through Profibus for applications concerned with the processing of images integrated in control systems, by means of a detailed study of two real cases with different bandwidth requirements. We analyze the special features of an artificial vision system making use of Profibus as a transport system, the scheduling of the traffic in order to guarantee the delivery of the images and the control traffic before their deadlines, the protocol used, and the compression techniques usable in this kind of system, which enable us to reduce the necessary bandwidth for the applications without degrading the operation of the image processing application. We p…

EngineeringProfibusbusiness.industryMachine visionReal-time computingImage processingUSableAutomationScheduling (computing)Control and Systems EngineeringControl systemElectrical and Electronic EngineeringbusinessData compressionIEEE Transactions on Industrial Electronics
researchProduct

Nonlinear Control of a Pneumatic Muscle Actuator System

2001

Abstract The performance of a Pneumatic Muscle Actuator under three tracking control strategies is compared: robust backstepping, sliding-mode and gain scheduling. Robustness is assured for the three controllers in the presence of model uncertainties and external perturbations. Exponential stability is proved for the sliding-mode tracking controller, ultimate boundedness for the backstepping tracking controller and exponential stability for constant or slowly-varying reference signals for the gain scheduling controller. Computer simulations show a good performance for the tracking of a sine wave by the first two controllers, although the sliding-mode strategy yields a high-frequency switchi…

EngineeringSine waveGain schedulingExponential stabilityControl theoryRobustness (computer science)business.industryBacksteppingControl engineeringNonlinear controlbusinessSliding mode controlIFAC Proceedings Volumes
researchProduct

Effect of Channel-Quality Indicator Delay on HSDPA Performance

2007

This paper evaluates the effect of the channel estimation inaccuracy on the performance of an HSDPA system. This study provides some results from system level simulations that have been conducted over a very complete dynamic simulator which models an HSDPA system full compliant with specifications. This emulator allows performing multi-user transmission and link adaptation with a limited modulation and coding scheme (MCS) selection based on the channel quality indicator (CQI) modes. Many factors such as the user equipment (UE) speed, the employed scheduling algorithm or the traffic load have been considered in the assessment. Moreover the intrinsic constraints of a WCDMA system like HSDPA h…

EngineeringUser equipmentbusiness.industryCode division multiple accessComputerSystemsOrganization_COMPUTER-COMMUNICATIONNETWORKSTelecommunications linkElectronic engineeringLink adaptationChannelizedMobile telephonybusinessCoding (social sciences)Scheduling (computing)2007 IEEE 65th Vehicular Technology Conference - VTC2007-Spring
researchProduct

A Model-Based Control Strategy for Wind Turbines with Asynchronous Generator

2007

In this paper a model based control methodology is described with reference to a wind turbine for production of alternative energy. The mathematical model of a 600 kW wind turbine is taken into account assuming a well defined profile of the rotor blades. A set of reference angular speeds of the asynchronous generator and a set of reference pitch angles of the blade wind turbine are obtained in order to maximize the extracted wind power and to reach equilibrium conditions between the wind-generated torque and the electric torque of the generator. Finally a PID model based controller is designed and then tested by means of simulation experiments.

EngineeringWind powerbusiness.industryRotor (electric)Induction generatorPID controllerTurbinelaw.inventionPhysics::Fluid DynamicsElectricity generationSettore ING-INF/04 - AutomaticaControl theorylawWind power generation Asynchronous rotating machines Gain scheduling control PID control.Physics::Space PhysicsTorquebusinessPhysics::Atmospheric and Oceanic PhysicsGenerator (mathematics)2007 International Conference on Clean Electrical Power
researchProduct

LPV Predictive Control of the Stall and Surge for Jet Engine 1

2001

Abstract Predictive control of constrained LPV systems is applied to the model of the stall and surge control for jet engine compressors. The objective of the used technique is to optimize nominal performance while guaranteeing robust stability and constraint satisfaction. This is achieved by exploiting invariant sets and a receding horizon optimization procedure which provides on-line a non-linear correction to a gain-scheduled linear feedback designed off-line. A comparison with a contractive gain-scheduling control technique is also shown.

Engineeringbusiness.industryControl engineeringConstraint satisfactionJet enginelaw.inventionModel predictive controlGain schedulinglawControl theoryRobust controlbusinessGas compressorSurge controlStall (engine)IFAC Proceedings Volumes
researchProduct

LPV Model Identification For The Stall And Surge Control of a Jet Engine

2001

Abstract The problem of identifying discrete-time Linear Parameter Varying (LPV) models of non-linear or time-varying systems for gain scheduling control is considered assuming that inputs, outputs and the scheduling parameters are measured, and a form of the functional dependence of the coefficients on the parameters is known. The identification procedure is applied to the controlled model of compressors for jet engines. The model is controlled in order to avoid rotating stall and surge. Aim of the present paper is to identify the LPV model based on the nonlinear model of compressors in order to design a robust gain scheduling predictive controller.

Engineeringbusiness.industrySystem identificationStall (fluid mechanics)Control engineeringJet enginelaw.inventionScheduling (computing)Gain schedulinglawControl theorySurgebusinessGas compressorSurge controlIFAC Proceedings Volumes
researchProduct

Load Optimization in Endurance Sports by Means of Antagonistic Dynamical Models

2012

Abstract Prediction of performance dynamics as well as planning and control of corresponding optimal load profiles are difficult tasks in endurance sports. The reason is that fatigue and recovery are effective with delays. I. e. a small overload in the start phase can cause a collapse long time later. Such interaction between load and performance can be modelled by means of antagonistic models like PerPot and then can help to optimize performance together with avoiding overload. Based on a lot of positive results extensions of PerPot have been developed, which are now able to determine the individual anaerobe threshold (IAT) by simulation, giving heart rate oriented load scheduling a new qu…

Engineeringbusiness.industrymedia_common.quotation_subjectLoad optimizationControl (management)The InternetQuality (business)General MedicineLoad schedulingbusinessSimulationmedia_commonIFAC Proceedings Volumes
researchProduct