Critical issues in the PD testing methodology for XLPE-insulated MV cables: An experimental case
This paper describes some critical issues arising during the partial discharge (PD) testing of a 500m delivery length of an XLPE-insulated MV cable. At first, conventional PD measurements were performed on the whole length by using a standard acquisition system; PDs activity was detected, but the system allowed the operator to localize the PDs only on a length of 70 m. A visual inspection of this section highlighted the presence of an excoriation in the outer sheet. Aiming at a more accurate pin-pointing of the defect, more measurements were carried out in the proximity of the outer defect using a portable PD detection system. These measurements showed PDs activity, whose source was located…