Currents Distribution During a Fault in an MV Network: Methods and Measurements
When a single line to ground fault happens on the MV side of a HV/MV system, only a small portion of the fault current is injected into the ground by the ground-grid of the faulty substation. In fact the fault current is distributed between grounding electrodes and MV cables sheaths. In systems with isolated neutral or with resonant earthing this may be sufficient to provide safety from electric shock. Experimental measurements were performed on a real MV distribution network: a real single line to ground fault was made and fault currents were measured in the faulty substation and in four neighboring substations. In this paper the problem of fault current distribution is introduced, the tes…
A comparison of two innovative customer power devices for Smart Micro-Grids
The paper presents a comparison of two prototypes of innovative Customer Power Devices designed for applications in Smart Micro-Grids. The devices are both equipped with Energy Storage Systems, consisting in Lithium batteries and have been assembled, independently, by the DIAEE of the University of Rome 'La Sapienza' and the DEIM of the University of Palermo in collaboration with the Italian National Agency for New Technologies, Energy and Sustainable Economic Development (ENEA). In the paper, the characteristics and the operating modes of the devices are examined and some consideration on their application in Low Voltage Smart Micro-Grids are provided. © 2015 IEEE.
Current and Voltage Behaviour During a Fault in a HV/MV System: Methods and Measurements
When a single line to ground fault happens on the MV side of a HV/MV system, only a small portion of the fault current is injected into the ground by the ground-grid of the faulty substation. In fact the fault current is distributed between grounding electrodes and MV cables sheaths. In systems with isolated neutral or with resonant earthing this may be sufficient to provide safety from electric shock. Experimental measurements were performed on a real MV distribution network: a real single line to ground fault was made and fault currents were measured in the faulty substation and in four neighbouring substations. In this paper the problem of fault current distribution is introduced, the te…
The Global Grounding System: Definitions and guidelines
The present paper presents the preliminary results of the ongoing Italian METERGLOB project on the contribution given by the exposed conductive parts to a Global Grounding System. One of the expected results of METERGLOB is to carry out guidelines for the identification of a Global Grounding System. These guidelines must be defined on the basis of the definitions and methods present in the current international standards on grounding and safety. In the paper some definitions and elements to be taken into account for the identification of a Global Grounding System are given.
Influence of LV neutral grounding on global earthing systems
International Standards define a Global Earthing System as an earthing net created interconnecting local Earthing Systems (generally through the shield of MV cables and/or bare buried conductors). In Italy, the regulatory authority for electricity and gas requires distributors to guarantee the electrical continuity of LV neutral conductor. This requirement has led to the standard practice of realizing “reinforcement groundings” along the LV neutral conductor path and at users’ delivery cabinet. Moreover, in urban high-load scenarios (prime candidates to be part of a Global Earthing System), it is common that LV distribution scheme creates, through neutral conductors, an effective connection…
A practical method to test the safety of HV/MV substation Grounding Systems
The adequacy of a Grounding System (GS) to the safety conditions has to be periodically tested by measurements. The test methods and techniques used to verify the electrical characteristics of the GS include the measurements of step and touch voltages. The goal of the test is to verify that touch voltage and step voltage remain below a safe value in all the zones of the installation. The measurements can present some operational difficulties. The purpose of this paper is to present the procedure, step-by-step, of a practical method of measuring touch/step voltages in grounding systems located in urban or industrial areas with reduced accessibility. The suggested method uses auxiliary curren…
Challenges in Energy Systems for the Smart-Cities of the Future
In the last years the European Union has actively promoted the renewable energies and the Combined Heat and Power (CHP) also for residential and tertiary buildings. The exploitation of renewable sources and cogeneration seems hampered by the regulatory wall that prohibit for residential, tertiary and commercial buildings the constitution of users clusters. In fact, the unification up to a threshold value of some tens of kVA, at least, can facilitate the installation of renewable energy power plants as solar PV modules or CHP systems (cogeneration) or CCHP systems (tri-generation), overcoming technical and economical barriers and combining several load profiles. The actual distribution syste…