Integration of DEMO hazard piping into the tokamak building
Abstract Because of the complexity of the design of a Fusion Power Plant like the EU DEMOnstration power plant the study of the plant layout must proceed in parallel with the design of the major systems. This is necessary to ensure that the design of the plant incorporates from the very beginning sound considerations on: • Safety and licensing, • Personnel security in context with operation and maintenance, • Adequate plant availability, and • Safe performance operation including delivery of few hundred MW net electric power to the electrical grid. Though it is a process of trial and change that follows the design evolution, this approach allows a better and continuous control of the numero…
Overview of the DEMO staged design approach in Europe
This paper describes the status of the pre-conceptual design activities in Europe to advance the technical basis of the design of a DEMOnstration Fusion Power Plant (DEMO) to come in operation around the middle of this century with the main aims of demonstrating the production of few hundred MWs of net electricity, the feasibility of operation with a closed-tritium fuel cycle, and maintenance systems capable of achieving adequate plant availability. This is expected to benefit as much as possible from the ITER experience, in terms of design, licensing, and construction. Emphasis is on an integrated design approach, based on system engineering, which provides a clear path for urgent R&D …
Initial layout of DEMO buildings and configuration of the main plant systems
Abstract The realization of a Demonstration Fusion Power Reactor (DEMO) to follow ITER, with the capability of generating several hundred MW of net electricity and operating with a closed fuel-cycle is viewed by Europe and many of the nations engaged in the construction of ITER as the remaining crucial step towards the exploitation of fusion power. The development of suitable configurations of plant systems inside the tokamak building to allow for the various maintenance operations and to meet the numerous system operating functions and safety requirements is one of the initial priorities. A task to establish an initial layout of the DEMO buildings and the integration of the main plant syst…
Key EU DEMO plant and building layout criteria
Abstract An early attention to the layout of both plant site and its buildings is essential in a complex plant under preliminary design as DEMO in order to meet the assigned targets, namely i) the licensing requirements ii) a good availability in delivery electricity to the grid. The layout definition has to follow several criteria that become more complex and stringent for nuclear buildings, e.g. functional, maintenance, fire protection, safety, human factors, shielding, and remote handling. The criterion As Low As Reasonable Achievable, with respect to the dose to the staff, has to be applied in design, operation, maintenance and decommissioning phases. The tokamak building, where several…
Integrated design of breeding blanket and ancillary systems related to the use of helium or water as a coolant and impact on the overall plant design
Currently, for the EU DEMO, two Breeding Blankets (BBs) have been selected as potential candidates for the integration in the reactor. They are the Water Cooled Lithium Lead and the Helium Cooled Pebble Bed BB concepts. The two BB variants together with the associated ancillary systems drive the design of the overall plant. Therefore, a holistic investigation of integration issues derived by the BB and the installation of its ancillary systems has been performed. The issues related to the water activation due to the 16N and 17N isotopes and the impact on the primary heat transfer systems have been investigated providing guidelines and dedicated solution for the integration of safety devices…
Progress in EU Breeding Blanket design and integration
Abstract In Europe (EU), in the frame of the EUROfusion consortium activities, four Breeding Blanket (BB) concepts are being developed with the aim of fulfilling the performances required by a near-term fusion power demonstration plant (DEMO) in terms of tritium self-sufficiency and electricity production. The four blanket options cover a wide range of technological possibilities, as water and helium are considered as possible coolants and solid ceramic breeder in combination with beryllium and PbLi as tritium breeder and neutron multipliers. The strategy for the BB selection and operation has to account for the challenging schedule of the EU DEMO, the ambitious operational requirements of …