F. Riedl
Integration of DEMO hazard piping into the tokamak building
Abstract Because of the complexity of the design of a Fusion Power Plant like the EU DEMOnstration power plant the study of the plant layout must proceed in parallel with the design of the major systems. This is necessary to ensure that the design of the plant incorporates from the very beginning sound considerations on: • Safety and licensing, • Personnel security in context with operation and maintenance, • Adequate plant availability, and • Safe performance operation including delivery of few hundred MW net electric power to the electrical grid. Though it is a process of trial and change that follows the design evolution, this approach allows a better and continuous control of the numero…
Key EU DEMO plant and building layout criteria
Abstract An early attention to the layout of both plant site and its buildings is essential in a complex plant under preliminary design as DEMO in order to meet the assigned targets, namely i) the licensing requirements ii) a good availability in delivery electricity to the grid. The layout definition has to follow several criteria that become more complex and stringent for nuclear buildings, e.g. functional, maintenance, fire protection, safety, human factors, shielding, and remote handling. The criterion As Low As Reasonable Achievable, with respect to the dose to the staff, has to be applied in design, operation, maintenance and decommissioning phases. The tokamak building, where several…