0000000000240863

AUTHOR

Di Silvestre M. L.

A blockchain platform for Demand Response in Mediterranean islands: a smart contract for remuneration

The Blorin project started at the end of 2019 to support the implementation of a blockchain platform to support the energy services provision from end users by means of Demand Response and Vehicle to Grid programs. The experimental part of the project is being carried out on two Mediterranean islands and inside the University campus in Palermo. Customized smart contracts have been designed to support the active participation of end users to regulation services for the two weak electrical grids of the islands in the view of a deep penetration of renewable energy in the two energy systems. In particular, the smart contract for remuneration accounts for the very special energy situation of isl…

research product

Optimal energy management in the smart grid

In this chapter, the problem of energy management in smart grids is outlined. Optimized energy management is considered here as the operation of energy and power flow control in the aim of attaining minimum cost or minimum power losses while meeting technical constraints. Of course, according to the type of energy system in which such operation is carried out, the meaningful variables and objectives in the problem may largely change. As the extension of the system increases, the influence of the physical behaviour of the electrical power lines takes a more important role. Power electronics takes instead an increasing influence, as the dimension of the power system decreases although Kirchho…

research product

Flexibility of grid interactive water heaters: The situation in the US

Among different solutions to increase flexibility of electricity system, grid interactive water heaters (GIWHs) can make a large contribution, against a relatively low cost. They can advantageously be used within a single building, a local energy community or within an entire distribution grid, thanks to the very fast response time, low cost, highly distributed resource and widely demonstrated technology. In the near future, the flexibility potential of GIWHs will certainly increase, thanks to the advantageous flexibility programs that have been implementing in some area of the world, with the aim of coordinating several million of GIWHs with the electricity network. In this study, we asses…

research product