0000000000334169
AUTHOR
Federico Carbone
Apparato per tracciare lo stato della superficie di un pavimento e procedimento di bilanciamento dinamico di un tale apparato
Research update for articles published in EJCI in 2016
The association of an excessive blood pressure increase with exercise (i.e., an increase in systolic blood pressure with exercise ≥95th percentile) with lower risk of subsequent events in patients with known or suspected coronary artery disease has been consistently verified even in those with baseline hypertension. Nonetheless, this negative association, also confirmed in another study on a Japanese population, might depend on peak VO2, such that the prognostic value of blood pressure response might be limited in patients with preserved exercise capacity. In addition, a hypertensive response with exercise (defined as a systolic blood pressure ≥220 mmHg during the test) has also been associ…
Potentialities of a Highway Alignment Optimization Method in an I-BIM Environment
The BIM (Building Information Modeling) approach potential in the civil engineering field opened novel scenarios in the design idea concept, from planning to executive and constructive phases. The related advantages are numerous and not only limited to a real-time interaction among the involved subjects, that can actually operate in an optimized 3D shared environment. Owing to the sharing information philosophy and to the features of various "smart objects" combined in the project, this innovation reduces potential errors and increases the effectiveness of the design solution in terms of both functionality and cost. Despite these advantages, the highway alignment design problem remains very…
Time reduction for completion of a civil engineering construction using fuzzy clustering techniques
In the civil engineering field, there are usually unexpected troubles that can cause delays during execution. This situation involves numerous variables (resource number, execution time, costs, working area availability, etc.), mutually dependent, that complicate the definition of the problem analytical model and the related resolution. Consequently, the decision-maker may avoid rational methods to define the activities that could be conveniently modified, relying only on his personal experience or experts’ advices. In order to improve this kind of decision from an objective point of view, the authors analysed the operation correction using a data mining technique, called Fuzzy Clustering. …