Active heave compensation of floating wind turbine installation using a catamaran construction vessel
Abstract The application of floating wind turbines is limited by the high cost that increases with the water depth. Offshore installation and maintenance continue to consume a high percentage of the project budget. To improve the installation efficiency of the floating offshore wind turbine, a novel concept is proposed by the SFI MOVE project. Several wind turbine superstructure components are preassembled onshore and carried to the installation site by a catamaran construction vessel. Each assembly can then be installed using only one lift, and the concept is less sensitive to weather conditions. In this paper, a control algorithm of the proposed hydraulic active heave compensator system i…