Eurofusion-DEMO Divertor - Cassette Design and Integration

International audience; The Eurofusion-DEMO design will complete the Pre Conceptual Design phase (PCD) with a PCD Gate, named G1, scheduled to take place in Q4 2020 that will focus on assessing the feasibility of the plant and its main components prior to entering into the Conceptual Design phase. In the paper first an overview is given of the Eurofusion-DEMO Divertor Assembly including design and interface description, systems and functional requirements, load specification, system classification, manufacturing procedures and cost estimate. Then critical issues are discussed and potential design solutions are proposed, e.g.:- Neutron material damage limits of the different (structural) mat…

research product

Progress in the initial design activities for the European DEMO divertor: Subproject "Cassette"

Abstract Since 2014 preconceptual design activities for European DEMO divertor have been conducted as an integrated, interdisciplinary R&D effort in the framework of EUROfusion Consortium. Consisting of two subproject areas, ‘Cassette’ and ‘Target’, this divertor project has the objective to deliver a holistic preconceptual design concept together with the key technological solutions to materialize the design. In this paper, a brief overview on the recent results from the subproject ‘Cassette’ is presented. In this subproject, the overall cassette system is engineered based on the load analysis and specification. The preliminary studies covered multi-physical analyses of neutronic, thermal,…

research product

Overview of the JET results in support to ITER

The 2014–2016 JET results are reviewed in the light of their significance for optimising the ITER research plan for the active and non-active operation. More than 60 h of plasma operation with ITER first wall materials successfully took place since its installation in 2011. New multi-machine scaling of the type I-ELM divertor energy flux density to ITER is supported by first principle modelling. ITER relevant disruption experiments and first principle modelling are reported with a set of three disruption mitigation valves mimicking the ITER setup. Insights of the L–H power threshold in Deuterium and Hydrogen are given, stressing the importance of the magnetic configurations and the recent m…

research product

Key EU DEMO plant and building layout criteria

Abstract An early attention to the layout of both plant site and its buildings is essential in a complex plant under preliminary design as DEMO in order to meet the assigned targets, namely i) the licensing requirements ii) a good availability in delivery electricity to the grid. The layout definition has to follow several criteria that become more complex and stringent for nuclear buildings, e.g. functional, maintenance, fire protection, safety, human factors, shielding, and remote handling. The criterion As Low As Reasonable Achievable, with respect to the dose to the staff, has to be applied in design, operation, maintenance and decommissioning phases. The tokamak building, where several…

research product

Integrated design of breeding blanket and ancillary systems related to the use of helium or water as a coolant and impact on the overall plant design

Currently, for the EU DEMO, two Breeding Blankets (BBs) have been selected as potential candidates for the integration in the reactor. They are the Water Cooled Lithium Lead and the Helium Cooled Pebble Bed BB concepts. The two BB variants together with the associated ancillary systems drive the design of the overall plant. Therefore, a holistic investigation of integration issues derived by the BB and the installation of its ancillary systems has been performed. The issues related to the water activation due to the 16N and 17N isotopes and the impact on the primary heat transfer systems have been investigated providing guidelines and dedicated solution for the integration of safety devices…

research product