Biological nutrient removal using intermittent aeration in a hybrid moving bed biofilm reactor
The paper presents an experimental study on a lab scale pilot plant in a Hybrid Moving Bed Biofilm Reactor. The pilot plant was fed with synthetic wastewater and was in operation considering two different operating conditions: continuous aeration and intermittent aeration. Both continuous and intermittent aeration were monitored and compared in order to seek the best conditions for carbon and nitrogen removal. At the beginning of the experimentation, an initial period of about 90 days was considered during which the pilot plant worked in bench scale configuration for allowing the formation of biofilm on the carriers. Once the biofilm growth was accomplished, the pilot plant worked for a fir…