0000000000780025
AUTHOR
Mattia Siccinio
Overview of the DEMO staged design approach in Europe
This paper describes the status of the pre-conceptual design activities in Europe to advance the technical basis of the design of a DEMOnstration Fusion Power Plant (DEMO) to come in operation around the middle of this century with the main aims of demonstrating the production of few hundred MWs of net electricity, the feasibility of operation with a closed-tritium fuel cycle, and maintenance systems capable of achieving adequate plant availability. This is expected to benefit as much as possible from the ITER experience, in terms of design, licensing, and construction. Emphasis is on an integrated design approach, based on system engineering, which provides a clear path for urgent R&D …
Feasibility of D-D start-up under realistic technological assumptions for EU-DEMO
Abstract One of the main issues in view of the realization of a DEMOnstration fusion reactor is the availability of a sufficient external supply of tritium (T) to start operation. T is an unstable nuclide, which is almost absent in nature and is currently available as by-product in e.g. CANDU, whose operation in the next decades (both in terms of life extension of existing reactors and construction of new ones) is at the moment under debate. During DEMO operation, T will be generated on-site by breeding blanket, employing the neutrons originating from D-T reaction. However, it is considered that a certain initial amount of T is needed to start operation, the so-called start-up inventory. An…