0000000001225470
AUTHOR
M. Calvo
Stressing sequence of steel cable-stayed bridges built by cantilevering
The construction of cable-stayed bridges by cantilevering implies several changes of geometry, stress and strain patterns during the assemblage of segments. The main target to be satisfied in the construction process is the achievement of the required final geometry and of a convenient state of stress for self-weight and sustained loads. The sequence of stay stressing and the values of prestressing forces at each stage of segment assembling have the main role for reaching the desired result of design, due to the large redundancy of cable-stayed structures.Among the different procedures proposed in the literature for initial cable force determination, the Partial Elastic Scheme (PES) Method …
Sea level rise in the Mediterranean Sea: High resolution constraints from vermetid reefs
The Mediterranean Sea (MS), is extremely sensitive to rising sea-levels (SL) as attested by drowned archeological remains from the Roman Period [2]. Due to the absence of coral reefs, evidence for recent and Holocene SL change has so far mainly been restricted to coastal cores [1] archeological remains [2] and submerged speleothem deposits. Vermetid reefs are an extremely sensitive high resolution carbonate archive [3,4] and they are mainly formed in the lower intertidal zone by gregarious and sessile gastropods belonging to the genus Dendropoma (family Vermetidae). Since their interval of growth is restricted to the tidal zone, they can be used as precise SL proxies (about ±0.1 m in low ra…