6533b873fe1ef96bd12d4ebd
RESEARCH PRODUCT
Recent GRBs observed with the 1.23m CAHA telescope and the status of its upgrade
S. GuziyAntonio De Ugarte PostigoJavier GorosabelUri CarsentyA. J. Castro-tiradoStefano MottolaRonan CunniffeMartin JelínekSebastian Castillo CarrionMatilde FernándezPetr KubánekJose Luis OrtizV. TerronNicolás MoralesNuria Huélamosubject
High Energy Astrophysical Phenomena (astro-ph.HE)Article Subjectlcsh:AstronomyComputer scienceAstronomyFOS: Physical sciencesAstronomy and AstrophysicsBOOTESlaw.inventionlcsh:QB1-991TelescopeUpgradeSpace and Planetary ScienceObservatorylawAstrophysics - Instrumentation and Methods for AstrophysicsAstrophysics - High Energy Astrophysical PhenomenaGamma-ray burstInstrumentation and Methods for Astrophysics (astro-ph.IM)description
We report on optical observations of Gamma-Ray Bursts (GRBs) followed up by our collaboration with the 1.23m telescope located at the Calar Alto observatory. The 1.23m telescope is an old facility, currently undergoing upgrades to enable fully autonomous response to GRB alerts. We discuss the current status of the control system upgrade of the 1.23m telescope. The upgrade is being done by our group based on the Remote Telescope System, 2nd Version (RTS2), which controls the available instruments and interacts with the EPICS database of Calar Alto. (Our group is called ARAE (Robotic Astronomy & High-Energy Astrophysics) and is based on members of IAA (Instituto de Astrofísica de Andalucía). Currently the ARAE group is responsible to develop the BOOTES network of robotic telescopes (Jelínek et al. 2009).) Currently the telescope can run fully autonomously or under observer supervision using RTS2. The fast reaction response mode for GRB reaction (typically with response times below 3 minutes from the GRB onset) still needs some development and testing. The telescope is usually operated in legacy interactive mode, with periods of supervised autonomous runs under RTS2. We show the preliminary results of several GRBs followed up with observer intervention during the testing phase of the 1.23m control software upgrade. Copyright © 2010 Javier Gorosabel et al.
year | journal | country | edition | language |
---|---|---|---|---|
2010-01-04 |