Search results for "Dynamic priority scheduling"
showing 10 items of 20 documents
Scheduling Multimodal Transportation Systems
2004
Abstract In this paper a Lagrangian based heuristic procedure for scheduling transportation networks is presented. The solution procedure schedules a single line at a time, possibly correcting the previous decisions at each step.
Looking for the best modes helps solving the MRCPSP/max
2013
The multi-mode resource-constrained project scheduling problem with minimum and maximum time lags MRCPSP/max is a very general project scheduling problem with multiple execution modes per activity, renewable and non-renewable resources and minimum and maximum time lags between activities. In this paper, we describe SA-EVA, an algorithm for the problem. SA-EVA first searches for the best mode for each activity, without considering renewable resources. In this phase a simulated annealing is applied. Once a mode vector has been chosen, the problem reduces to the RCPSP/max, which SA-EVA solves with EVA, an algorithm designed in Ballestin et al. [2009. An evolutionary algorithm for the resource-…
Approximation algorithm for constrained coupled-tasks scheduling problem
2014
International audience; We tackle the makespan minimization coupled-tasks problem in presence of compatibility constraints. In particular, we focus on stretched coupled-tasks, i.e. coupled-tasks having the same sub-tasks execution time and idle time duration. In such context, we propose some complexity results according to several parameters and we design an efficient polynomial-time approximation algorithm.
An approximate/exact objective based search technique for solving general scheduling problems
2018
Abstract In this paper, we analyze single machine scheduling problems under the following minimization objectives: the maximum completion time (makespan), the total completion time and the maximum lateness, including fundamental practical aspects, which often occur in industrial or manufacturing reality: release dates, due dates, setup times, precedence constraints, deterioration (aging) of machines, as well as maintenance activities. To solve the problems, we propose an efficient representation of a solution and a fast neighborhood search technique, which calculates an approximation of criterion values in a constant time per solution in a neighborhood. On this basis, a novel approximate/ex…
Two Job Cyclic Scheduling with Incompatibility Constraints
2001
The present paper deals with the problem of scheduling several repeated occurrences of two jobs over a finite or infinite time horizon in order to maximize the yielded profit. The constraints of the problem are the incompatibilities between some pairs of tasks which require a same resource.
Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres
2012
Abstract In this paper we present an application of project scheduling concepts and solution procedures for the solution of a complex problem that comes up in the daily management of many company Service Centres. The real problem has been modelled as a multi-mode resource-constrained project scheduling problem with pre-emption, time and work generalised precedence relationships with minimal and maximal time lags between the tasks and due dates. We present a complete study of work GPRs which includes proper definitions, a new notation and all possible conversions amongst them. Computational results that show the efficiency of the proposed hybrid genetic algorithm and the advantages of allowi…
Exact Response Time Analysis of Hierarchical Fixed-Priority Scheduling
2009
Hierarchical scheduling has recently been used to provide temporal isolation to embedded virtualised systems. Response time analysis is a common way to derive a schedulability test for these systems. This paper points out that response time analysis for hierarchical fixed-priority scheduling found in the literature is only exact for tasks of the highest priority domain. For the rest of the tasks is an upper bound. In our work, we provide the exact analysis and we compare it with previously published works.
HEURISTIC PROCEDURES FOR GROUP SCHEDULING
1989
ABSTRACT The group scheduling problem is investigated, solving numerous small and large sized examples with eight sequencing algorithms. A new approach, basically consisting in the definition of real machines' idles for each group, utilizing allowed shifting of non critical activities, is proposed. Moreover the CDS multi-shot algorithm is extended to group scheduling.
Trade-Off between Increased Talk-Time and LTE Performance
2010
The purpose of this paper is to analyze the trade-off conditions between battery saving opportunities and long term evolution network performance. To achieve this goal voice over IP with discontinuous reception is studied. Analysis is conducted with vast amount of different settings, including on duration, inactivity and discontinuous reception cycle timers. The quality of service and battery saving opportunities with discontinuous reception are evaluated with a dynamic system simulator which enables detailed simulation of multiple users and cells with realistic assumptions. This paper indicates high battery saving, i.e., increased talk-time opportunities without compromising the performanc…
Priority Enabled Grant-Free Access With Dynamic Slot Allocation for Heterogeneous mMTC Traffic in 5G NR Networks
2021
Although grant-based mechanisms have been a predominant approach for wireless access for years, the additional latency required for initial handshake message exchange and the extra control overhead for packet transmissions have stimulated the emergence of grant-free (GF) transmission. GF access provides a promising mechanism for carrying low and moderate traffic with small data and fits especially well for massive machine type communications (mMTC) applications. Despite a surge of interest in GF access, how to handle heterogeneous mMTC traffic based on GF mechanisms has not been investigated in depth. In this paper, we propose a priority enabled GF access scheme which performs dynamic slot …