Search results for "Scheduling"

showing 10 items of 275 documents

Looking for the best modes helps solving the MRCPSP/max

2013

The multi-mode resource-constrained project scheduling problem with minimum and maximum time lags MRCPSP/max is a very general project scheduling problem with multiple execution modes per activity, renewable and non-renewable resources and minimum and maximum time lags between activities. In this paper, we describe SA-EVA, an algorithm for the problem. SA-EVA first searches for the best mode for each activity, without considering renewable resources. In this phase a simulated annealing is applied. Once a mode vector has been chosen, the problem reduces to the RCPSP/max, which SA-EVA solves with EVA, an algorithm designed in Ballestin et al. [2009. An evolutionary algorithm for the resource-…

Rate-monotonic schedulingEarliest deadline first schedulingMathematical optimizationNurse scheduling problemComputer scienceGenetic algorithm schedulingStrategy and ManagementEvolutionary algorithmDynamic priority schedulingManagement Science and Operations ResearchIndustrial and Manufacturing EngineeringFair-share schedulingScheduling (computing)International Journal of Production Research
researchProduct

Approximation algorithm for constrained coupled-tasks scheduling problem

2014

International audience; We tackle the makespan minimization coupled-tasks problem in presence of compatibility constraints. In particular, we focus on stretched coupled-tasks, i.e. coupled-tasks having the same sub-tasks execution time and idle time duration. In such context, we propose some complexity results according to several parameters and we design an efficient polynomial-time approximation algorithm.

Rate-monotonic schedulingEarliest deadline first schedulingOptimizationBipartite graphMathematical optimizationOpen-shop schedulingSchedulesDistributed computingComplexity theoryProcessor schedulingDynamic priority schedulingApproximation methodscoupled-tasksFair-share schedulingApproximation algorithmsFixed-priority pre-emptive schedulingNurse scheduling problemTwo-level schedulingMathematics[ INFO.INFO-RO ] Computer Science [cs]/Operations Research [cs.RO]
researchProduct

An approximate/exact objective based search technique for solving general scheduling problems

2018

Abstract In this paper, we analyze single machine scheduling problems under the following minimization objectives: the maximum completion time (makespan), the total completion time and the maximum lateness, including fundamental practical aspects, which often occur in industrial or manufacturing reality: release dates, due dates, setup times, precedence constraints, deterioration (aging) of machines, as well as maintenance activities. To solve the problems, we propose an efficient representation of a solution and a fast neighborhood search technique, which calculates an approximation of criterion values in a constant time per solution in a neighborhood. On this basis, a novel approximate/ex…

Rate-monotonic schedulingMathematical optimization021103 operations researchSingle-machine schedulingJob shop schedulingComputer science0211 other engineering and technologiesaging effectmetaheuristic02 engineering and technologyDynamic priority schedulingsetup timeFair-share schedulingScheduling (computing)Metaheuristic algorithmsTwo-level scheduling0202 electrical engineering electronic engineering information engineering020201 artificial intelligence & image processingschedulingmaintenance activitySoftwareprecedence constraintsApplied Soft Computing
researchProduct

Two Job Cyclic Scheduling with Incompatibility Constraints

2001

The present paper deals with the problem of scheduling several repeated occurrences of two jobs over a finite or infinite time horizon in order to maximize the yielded profit. The constraints of the problem are the incompatibilities between some pairs of tasks which require a same resource.

Rate-monotonic schedulingMathematical optimizationJob shop schedulingComputer scienceStrategy and ManagementDistributed computingFlow shop schedulingDynamic priority schedulingManagement Science and Operations ResearchFair-share schedulingMultiprocessor schedulingComputer Science ApplicationsNurse scheduling problemManagement of Technology and InnovationTwo-level schedulingBusiness and International ManagementComputer Science::Operating Systems
researchProduct

Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres

2012

Abstract In this paper we present an application of project scheduling concepts and solution procedures for the solution of a complex problem that comes up in the daily management of many company Service Centres. The real problem has been modelled as a multi-mode resource-constrained project scheduling problem with pre-emption, time and work generalised precedence relationships with minimal and maximal time lags between the tasks and due dates. We present a complete study of work GPRs which includes proper definitions, a new notation and all possible conversions amongst them. Computational results that show the efficiency of the proposed hybrid genetic algorithm and the advantages of allowi…

Rate-monotonic schedulingService (systems architecture)Information Systems and ManagementPrecedence diagram methodGeneral Computer ScienceOperations researchComputer scienceDistributed computingDynamic priority schedulingSchedule (project management)Management Science and Operations ResearchIndustrial and Manufacturing EngineeringFair-share schedulingFixed-priority pre-emptive schedulingGenetic algorithm schedulingModeling and SimulationTwo-level schedulingEuropean Journal of Operational Research
researchProduct

Exact Response Time Analysis of Hierarchical Fixed-Priority Scheduling

2009

Hierarchical scheduling has recently been used to provide temporal isolation to embedded virtualised systems. Response time analysis is a common way to derive a schedulability test for these systems. This paper points out that response time analysis for hierarchical fixed-priority scheduling found in the literature is only exact for tasks of the highest priority domain. For the rest of the tasks is an upper bound. In our work, we provide the exact analysis and we compare it with previously published works.

Rate-monotonic schedulingTheoretical computer scienceComputer scienceServerResponse timeDynamic priority schedulingParallel computingTemporal isolationUpper and lower boundsFair-share schedulingScheduling (computing)2009 15th IEEE International Conference on Embedded and Real-Time Computing Systems and Applications
researchProduct

HEURISTIC PROCEDURES FOR GROUP SCHEDULING

1989

ABSTRACT The group scheduling problem is investigated, solving numerous small and large sized examples with eight sequencing algorithms. A new approach, basically consisting in the definition of real machines' idles for each group, utilizing allowed shifting of non critical activities, is proposed. Moreover the CDS multi-shot algorithm is extended to group scheduling.

Rate-monotonic schedulingTheoretical computer scienceHeuristic (computer science)Computer scienceGroup (mathematics)Two-level schedulingDynamic priority schedulingFlow shop schedulingFair-share schedulingGroup scheduling
researchProduct

Integrated Production and Predictive Maintenance Planning based on Prognostic Information

2019

International audience; This paper address the problem of scheduling production and maintenance operation in predictive maintenance context. It proposes a contribution in the decision making phase of the prognostic and health management framework. Theprognostics and decision processes are merged and an ant colony optimization approach for finding the sequence of decisions that optimizes the benefits of a production system is developed. A case study on a single machine composed of several components where machine can have several usage profiles. The results show thatour approach surpasses classical condition based maintenance policy.

Remaining UsefulLife0209 industrial biotechnology021103 operations researchHealth management systemOperations researchComputer scienceCondition-based maintenanceAnt colony optimization algorithms[INFO.INFO-DS]Computer Science [cs]/Data Structures and Algorithms [cs.DS]0211 other engineering and technologiesScheduling (production processes)02 engineering and technologyPredictive maintenanceAnt Colony Optimization[SPI.AUTO]Engineering Sciences [physics]/Automatic020901 industrial engineering & automationPrognostic InformationProduction and Maintenance SchedulingPrognosticsIntegrated productionDecision processPredic-tive Maintenance
researchProduct

Performance Analysis in Spatially Correlated IEEE 802.11 Networks

2012

Wireless mesh networks are difficult to be characterized, especially under multi-hop traffic streams. The problem is that the local view of the channel and the correlation between the buffers of consecutive nodes in a stream path make complicated the identification of the contention level perceived by each station along the time. Such a figure is used in the models based on the so called decoupling assumption for evaluating the final scheduling of simultaneous channel access grants. In this paper we propose a simplified mesh network model focused on capturing the correlation due to the network topology and traffic routes rather than the access protocol state at each node. To this purpose, w…

Routing protocolWireless mesh networkbusiness.industryWireless networkComputer scienceSettore ING-INF/03 - TelecomunicazioniDistributed computingMesh networkingThroughputNetwork topologyScheduling (computing)IEEE 802.11Wireless lanComputer Science::Networking and Internet ArchitecturebusinessSpatial Correlated Wireless Network Performance EvaluationNetwork modelComputer network
researchProduct

Reliable Coverage with Circumferential WMSNs

2021

This work tackles the closed peripheral coverage issue. Such circumferential surveillance is essential in numerous realistic applications where the goal is to ensure rapid detection of any unauthorized entry/exit of the monitored area. To respond to these requirements, peripheral WMSNs can be rapidly deployed around areas of interest (e.g., temporary military camps, natural or nuclear disasters, etc.). While it seems simple, this solution raises two major challenging issues. First, checking whether the deployed peripheral WMSN forms a closed shape around the monitored region. That is, any object trying to leave or access this area must be instantaneously detected by at least one multimedia …

SIMPLE (military communications protocol)Computer scienceDistributed algorithmbusiness.industryReliability (computer networking)Sensor nodebusinessRapid detectionComputer networkScheduling (computing)ICC 2021 - IEEE International Conference on Communications
researchProduct